Latter-day-LR 950403Rone Engineers
Geotechnical Consultants
Materials Testing
,.,Ro&eEngineers..
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number Date of Observation
D42518-053
I FEB. 27, 1995
IPurlhase Order
Relort Date
To
JOHN R. HORTON, ARCHITECT
Location
PAVING - 40'W X 60'S OF NORTHWEST CORNER OF BUILDING
Contractor '
W, B, KIBLER CONSTRUCTION
SuppLier
TXI
Mix Number
8273
Weather Conditions PARTLY CLOUDY
04/03/95
IPlant I Truck
41 90
IMix Description
Ambient Temperature {°F)
68
Time Sampled
8:50 AM
Physical Data
ITicl
34'
Water Added
15.0 GALS
ACTUAL
SLUMP (in.)
--4 1/4"
SPECI
Concrete Cylinder Test(s)
ACTUAL
SpecimenNo. (Days) Age I Test Date I
38A 7 3/06/95
38B 28 3/27/95
38C 28 3/27/95
38D HOLD HOLD
SPECI
Tot Load
(lbs.)
101OOO
124000
125000
Compressive
Strength (psi)
3570
439O
4420
4OOO
Strengt
Curing Method Test Method
ASTM C 31 ASTM C 39
Remarks and/or Distribution
IStandard 6" x 12" I
Area 28.27 sq. in.
Engineer/Technician KEVIN T
Distribution: (1) --JOHN R. HORTON
(1) -- W.B. KIBLER'~ONSTRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
LIMITATIONS: The reit relultl prelented herein were prepared be~ed upon the sl~ecific laml~el provided for telting. We mmume no
qUality (coml~o~itiorl, liepelrertce, perforrnlnce, etc.) er any other f$ltu~e of -;miler lUl~ec! matter provided by peri,hi or cm~diti~n~
Our letterl artd reportl are for the exclusive u~e of the clientl to whom they ere addre~.
c:\wpwin\forms\cytinder.rpt-95/kjh
.'et
83O
I Cor~crete Temperature {°F)
7,
FICATIONS
FICATIONS
h Required (psi)
JCKER
~ll=on~ibility for veriatiml in
April 3, 1995