Loading...
Latter-day-LR 950403Rone Engineers Geotechnical Consultants Materials Testing ,.,Ro&eEngineers.. Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number Date of Observation D42518-053 I FEB. 27, 1995 IPurlhase Order Relort Date To JOHN R. HORTON, ARCHITECT Location PAVING - 40'W X 60'S OF NORTHWEST CORNER OF BUILDING Contractor ' W, B, KIBLER CONSTRUCTION SuppLier TXI Mix Number 8273 Weather Conditions PARTLY CLOUDY 04/03/95 IPlant I Truck 41 90 IMix Description Ambient Temperature {°F) 68 Time Sampled 8:50 AM Physical Data ITicl 34' Water Added 15.0 GALS ACTUAL SLUMP (in.) --4 1/4" SPECI Concrete Cylinder Test(s) ACTUAL SpecimenNo. (Days) Age I Test Date I 38A 7 3/06/95 38B 28 3/27/95 38C 28 3/27/95 38D HOLD HOLD SPECI Tot Load (lbs.) 101OOO 124000 125000 Compressive Strength (psi) 3570 439O 4420 4OOO Strengt Curing Method Test Method ASTM C 31 ASTM C 39 Remarks and/or Distribution IStandard 6" x 12" I Area 28.27 sq. in. Engineer/Technician KEVIN T Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER'~ONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL LIMITATIONS: The reit relultl prelented herein were prepared be~ed upon the sl~ecific laml~el provided for telting. We mmume no qUality (coml~o~itiorl, liepelrertce, perforrnlnce, etc.) er any other f$ltu~e of -;miler lUl~ec! matter provided by peri,hi or cm~diti~n~ Our letterl artd reportl are for the exclusive u~e of the clientl to whom they ere addre~. c:\wpwin\forms\cytinder.rpt-95/kjh .'et 83O I Cor~crete Temperature {°F) 7, FICATIONS FICATIONS h Required (psi) JCKER ~ll=on~ibility for veriatiml in April 3, 1995