Loading...
Latter-day-LR 950403 (2)Rone Engineers Geotechnical Consultants Materials Testing Ro eEngineers Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS IPul',hase Order Relort Date Number D4251B-054 Date of Observation FEB. 27, 1995 04/03/95 To JOHN R. HORTON, ARCHITECT Location PAVING - 30'N X 25'E OF NORTHEAST CORNER OF BUILDING Contractor W. B. KIBLER CONSTRUCTION SupplierTXI IPlant 41 ITruck 96 IITic 34 Mix Description Mix Number 8273 Ambient74 Temperature (°F) I C~ Weather Conditions PARTLY CLOUDY Time Sampled Water Added 10:30 AM 10.0 GALS Physical Data ACTUAL SPEC SLUMP (in.) -- 4 1/2" -- Concrete Cylinder Test(s) ACTUAL No. (Days) (lbs.) Strength (psi) 39A 7 3/06/95 84500 39B 28 3/27/95 111000 39C 28 3/27/95 109000 39D HOLD HOLD TestMethod I Standard 6" x12"I ASTM C 39 Area 28.27 sq. in. Curing Method ASTM C 31 Remarks and/or Distribution Distribution: (1) -- JOHN R. HOR. T. ON ket 94O ~crete Temperature (°F) 5 IFICATIONS SPEC IFICATIONS (1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL Strengl 2990 4O00 3930 3860 Engineer/Technician KEVIN h Required (psi) LIMITATIONS: The te~t results I~e~nted here~n were prepared b~ upon t~ ~ifi~ ~pl~ ~ovid~ fM t~. We ~ no i qudiW (compo~tion, ~Mln~. ~,orm~, ~c.) ~ ~y ot~r feline of Ilmll~ 8~l~t mltter prowd~ by ~r~ ~ CO~ltlOM O~ lette~ ~ repo~ are for t~ excl~ive ~ of ~ cli~ts to w~m t~y ire c:\wp win\forms\cylind er.rpt-95/kjh 'UCKER eepon~ibility f~r v~iatien in April 3, 1995