Latter-day-LR 950403 (2)Rone Engineers
Geotechnical Consultants
Materials Testing
Ro eEngineers
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
IPul',hase Order
Relort Date
Number
D4251B-054
Date of Observation
FEB. 27, 1995
04/03/95
To
JOHN R. HORTON, ARCHITECT
Location
PAVING - 30'N X 25'E OF NORTHEAST CORNER OF BUILDING
Contractor
W. B. KIBLER CONSTRUCTION
SupplierTXI IPlant 41 ITruck 96 IITic 34
Mix Description
Mix Number
8273
Ambient74 Temperature (°F) I C~
Weather Conditions PARTLY CLOUDY
Time Sampled Water Added
10:30 AM 10.0 GALS
Physical Data
ACTUAL SPEC
SLUMP (in.) -- 4 1/2" --
Concrete Cylinder Test(s)
ACTUAL
No. (Days) (lbs.) Strength (psi)
39A 7 3/06/95 84500
39B 28 3/27/95 111000
39C 28 3/27/95 109000
39D HOLD HOLD
TestMethod I Standard 6" x12"I
ASTM C 39 Area 28.27 sq. in.
Curing Method
ASTM C 31
Remarks and/or Distribution
Distribution:
(1) -- JOHN R. HOR. T. ON
ket
94O
~crete Temperature (°F)
5
IFICATIONS
SPEC IFICATIONS
(1) -- W.B. KIBLER CONSTRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
Strengl
2990 4O00
3930
3860
Engineer/Technician KEVIN
h Required (psi)
LIMITATIONS: The te~t results I~e~nted here~n were prepared b~ upon t~ ~ifi~ ~pl~ ~ovid~ fM t~. We ~ no i
qudiW (compo~tion, ~Mln~. ~,orm~, ~c.) ~ ~y ot~r feline of Ilmll~ 8~l~t mltter prowd~ by ~r~ ~ CO~ltlOM
O~ lette~ ~ repo~ are for t~ excl~ive ~ of ~ cli~ts to w~m t~y ire
c:\wp win\forms\cylind er.rpt-95/kjh
'UCKER
eepon~ibility f~r v~iatien in
April 3, 1995