Loading...
Latter-day-LR 950403 (3)Rone Engineers Geotechnical Consultants Materials Testing Rc neEng Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number I Date of Observation D4251B-056 I FEB. 28, 1995 IPlrchase Order Rl )orr Date To JOHN R. HORTON, ARCHITECT Location PAVING - 20'N X 35'E OFF SOUTHWEST CORNER OF PARKING LOT Contractor W. B. KIBLER CONSTRUCTION SupplierTXl I 41Plant I Truck388 Mix Number I Mix Description 8273 I Weather Conditions CLOUDY Ambient Temperature (°F) 48 Time Sampled I Water Added 7:25 AM I 12.0 GALS Physical Data ACTUAL SLUMP (in.) -- 4" ~ Concrete Cylinder Test(s) ACTUAL No. (Days) (lbs.) Compressive Strength (psi) 40A 7 3/07/95 114500 4050 40B 28 3/28/95 130000 4600 40C 28 3/28~95 132000 4670 40D HOLD HOLD 40OO SPEC Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution IStandard 6" x 12" Area 28.27 sq. in. SPEC Stren Distribution: {1) -- JOHN R. HORTON (1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL Engineer/Technician TIM D JKE 04/03/95 )ncrete Temperature (°F) 58 ;IFICATIONS ;IFICATIONS Ith Required (psi) LIM TAT ONS: The reit re~ultl pre~ented herein were prepared b~ed upon t.he .l. pecific, eample~ Ixovid?l. for. te~ting. We m..u~..e n quality (comp~lition, appearance, performance, etc.) o~ any other feature of retailer lubject matter provided w/perlOtSI o!' cort~lilOl'll Our letterl and repertl are for the exclusive ule of the cliantl to whom they ire eddrel~ed. c :\wp win\forms\c¥1inder,rpt-95/kjh ) respor~bility for variation in over which we have no control. April 3, 1995