Loading...
Lakeside V2-LR 960521 (2) Maxim T®ch.e Southwestern Labs 2575 Lone ~ Dr. · P.O. Box 224227 Dallas, Texas 75222 Tdaphone: (Z14) ~I-Z;'O0 TECHNoLC~GJ~'s INC FAX: (214) g20-18Gl REPORT OF CONCRETE COMPRESSIVE STRENGTH CUENT: ~;. t(]~3GEJ[ CO Attn: Jeff Kruegar 100 Kro&er Drive Keller, TX 76248 PROJECT NO.: 0903506037 REPORT NO.: 41201 PROJECT: Kroger ~/-~8 DATE OF SEB%ICE: 5/09/96 Coppell, TX AUTHORIZATION: REPORT DALE: 5/21/96 SERVICES: Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. PROJECT DATA CONTRACTOR: David Christopher, Inc. CLASS OF CONCRETE: Mix Number 8273 CONCRETE SUPPUER: TXI DATE OF PLACEMENT: 5/09/96 PLANT: 41 TIME SAMPLED: 01: 45PM BY: Anthony Lively SPECIFICATION REQUIREMENT8 TEMPERATURE ('F) - A~: 82 CONCRETE: 78 STRENGTH: 3000psi @ 28 DAYS TRUCK NO: 456 TICKET NO: 587033 SLUMP: 5" max AIR CONTENT(%): 4.5 AIR: N/A LOCATION OF PLACEMENT: MErHOO OF TEST: ASTM C-39 South entrance to parking lot ASTM C-143 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYUNDERS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. ~nches] TESTED (days} (in.} (sa.in,) (lbs. force} (D~3 REMARK~ 1 1 5. O0 5/16/96 7 6. O0 28.27 71200 2520 1 2 6/06/96 28 1 3 6/06/96 28 1 4 HOLD HOLD Technician: Antho_ny Lively Started: 06:30AM Stopped: 02:00PM Technician Report Distribution: MAXIM TECH. eSOUTHWESTERN LABS (1) T~E FJt06ER CO (,) ..,,,,, o,...o.,,.,.. ,,,,:. (1) City of C_~e~_li - in~. Dept. (1) City of CoppeLL - BLdg. [n~p. Arthur ~.t Kl- Project Manager a13idy Or~y to me sample Tested ancl/~r Irmt:)ect~l, mncl ire not ~ ae ~ 43ulmmes m ~4nay ~ Or s~m.mr IWOaUCm.