Loading...
Latter-day-LR 950403 (4)Reno Engineers Geotechnical Consultants Materials Testing neEn, Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LA'I-rER-DAY SAINTS Number I Date of Observation D4251B-052 I FEB. 27, 1995 IPlrchase Order RT )irt Date To JOHN R. HORTON, ARCHITECT Location PAVING - 75'W X 15'S OF NORTHWEST CORNER OF BUILDING Contractor W. B. KIBLER CONSTRUCTION SupplierTXl I 41Plant J Truck96 Mix Description Mix Number 8273 Weather Conditions PARTLY CLOUDY Ambient Temperature (°F) 64 Time Sampled Water Added 7:48 AM 10.0 GALS ITi~cket 311712 04/03/95 mcrete Temperature (°F) ~2 Physical Data ACTUAL SPEC:IFICATIONS SLUMP (in.) -- 4 1/2" Concrete Cylinder Test(s) ACTUAL SPEC:IFICATIONS (lbs.) Strength (psi) Specimen I Age No. {Days) 37A 7 3~6/95 99000 3500 37B 28 3/27/95 130000 4600 37C 28 3/27/95 132000 4670 37D HOLD HOLD Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution 4OO0 Standard 6" x 12" Engineer/Technician Area 28.27 sq. in. Stren th Required (psi) re~pormibility for variation in rver which we have r~ corttrol. Distribution: (1) -- JOHN R. HORTON (1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL UMITATIONS: The te~t re~4dtm pre,anted herein were I~repared b#ed upon the apecific memple~ provided for tooting. We ~ume no quality (cornpoaitien, alN~earanca, performance, etc.) or ~y other feature of similar lubject matter provided by 13arlene or conditionl Our letterl a~d reports are for the excluliva uae of the clientl to whom they Ire addrealed. April 3, 1995 c:\wp win\forms\cylinder.rpt-95/kjh KEVIN rUCKER