Loading...
Latter-day-LR 950413 (6)Ron. Engineers En ineers Geotechnical Consultants Materials Testing Drilled Pier Report Project P~rchase Order CHURCH OF JESUS CHRIST LATTER DAY SAINTS Number I Date of Observation 04/12~95 R~port Date 04/13/95 D 2 B-060 I To / JOHN HORTON, ARCHITECT Building Structure I Engineer/Technician BOBBY--lAY S.E.T. SPECIFICATIONS AC['I'UAL Shaft ' Shaft ;I Depth tO Test No. i Pier No. gili"n'.~)ter Pe;itf;.")ti° Fn:ite' Dilin~.iterl strBa;ua~(gf'.l : Pen(e~ilti°n[ Dep'l't°~ilft.) 1 ; 1 18 3.0 I 18 10.0 / 4.3 14.3 / 2 2 18 3.0 18 11,8 / 3.5 15.3 / 3 3 18 3.0 18 11.0 / 3.5 14.5 / 4 4 18 3.0 18 12.0 / 3.0 15.0 / 5 5 18 3.0 18 12.0 / 3.3 15.3 / 6 6 18 3.0 18 12.0 / 3.2 15.2 / 7 7 18 3.0 18 12.0 / 3.5 ~ 15.5 / 8 8 ~ 18 3,0 18 12.2 / 3.2 15.4 Remarks and/or Distribution Notes: Depths are measured from top of ground surface unless otherwise specified. IPenetration denotes J distance drilled into bearing stratum. / / DISTRIBUTION: (1) --JOHN R. HORTON (1 ) --W. B. KIBLER CONSTRUCTION/SAM CARDWELL (1 ) --BILL FOWKES m (1 ) --CITY OF COPPELL/LEE STONE m LIMITATIONS: The reit re~ultl prelented herein were preflited b~ upon the specific aamplel provided for te~tir~g. We ~me n = responsibility for vitiation in quality (comp~ition, edpeitonoe, performance, etc. I o~ any other feature of ~irnilor lubject matter provided by per$on~ or cenditiona over which we have no control. Oul' lettera and raport~ era for the excluaive u~e of the clienta to whom they ate addre~:J. C:\Wp win\forms\pier-sft.rpt-95/kjh April 13, 1995