Loading...
Latter-day-LR 950420Rone Engineers Geotechnical Consultants Materials Testing Drilled Pier Report Project PL~rchase Order CHURCH OF JESUS CHRIST LATTER DAY SAINTS Number I Date of Observation 04/14/95 R~port Date 04/20/95 D4251 B-062 I T° JOHN HORTON, ARCHITECT / Building Structure I Engineer/Technician BOBBY RIY S.E.T. SPECIFICATIONS .. ACTUAL* Shaft Shaft' Depth to Diameter Penetratio Foot- Diameter Bearing ! Penetration~ Total Test No. Pier No. : (in.) n (ft.) note (in.) Stratum (ft.)I (ft.) Depth (ft.) 9 ; 9 i 18 310 18 14.0 / 3.3 17.3 10 10 18 3.0 ; I 18 13.0! / 3.4 16.4 11 11 ! 18 3.0 18 13.0 ! 3.8 16.8 i 12 12 !18 3.0i 18 i 13.2 /' 3.8 17.0 / 13 13 18 .3.0 18 13.0 / 3.2 16.2 / 14 14 18 3.0 18 13.5 / 3.9 17.4 / 15 15 18 3.0 18 13.0 / 3.0 16.0 / 16 16 18 3.0 18 12.3 / 3.0 15.3 / 17 17 18 3.0 18 12.0 / 3.0 15.0 / 18 18 18 3.0 , 18 12.0 / 3.2 15.2 Remarks and/or Distribution Notes: Depths are measured from top of ground surface unless otherwise specified. ~enetration denotes distance drilled into bearing stratum. | NOTE: REINFORCING STEEL WAS NOTED AS 4 #5 VERTICAL BARS / / DISTRIBUTION: (1) --JOHN R. HORTON (1) --W.B. KIBLER CONSTRUCTION/SAM CARDWELL (1) --BILL FOWKES (1) --CITY OF COPPELL/LEE STONE LIMITATIONS: The te~t resulte present-ed herein were prepated b~d upon the specific samples provided for testin{I, quality (composition, ippeatence, performance, Itc.) or any other leisure of similar lubject mister provided by persons or conditionl Our letterl ~ reports ere for the exclusive u~e of the clients to whom they ate eddreesed. re~l~omibility for variltion in which we hive 11o colltrol. c:\wpwin\forms\pier-sft.rpt-95/kjh April 20, 1995