Latter-day-LR 950420 (2)Rone Engineers
Geotechnical Consultants
Materials Testing
RoneEn ineers
Drilled Pier Report J *
Project P~Jrchase Order
CHURCH OF JESUS CHRIST LATTER DAY SAINTS
Number I Date of Observation 04/14/95 R~port Date 04/20/95
D42§lB-062 I
TO
/
JOHN HORTON, ARCHITECT
Building Structure I Engineer/Technician BOBBY TY S.E.T.
SPECIFICATIONS AccrUAL
Shaft Shaft - Depth to
Diameter Penetratio Foot- Diameter Bearing ! Penetration Total
Test No, Pier No, (in,) n (ft,) note (in,) Stratum (ft,I (ft,) Depth {ft,)
19 19 18 3.0 18 12,4 / 3.8 16,2
/
20 20 18 3,0 18 12,2 / 3,6 ! 15,8
/
2] 21 18 3,0 18 11,4 / 3,2 14,6
/
22 22 18 3.0 18 12.0 / 3,0 15,0
23 23 18 .3,0 18 12,3! / 3.2 ! 15,5
/
24 24 18 3.0 18 12.5 / 3.0 15.5
/
25 25 18 3.0 18 13.0 /! 3.0 16.0
/
26 26 18 3.0 18 12.0 /: 3.0 15.0
/
27 27 18 3.0 18 12.0 /i 3.2 15.2
/
18 3.0 18 12.4 ! 3.1 15.5
28
i
28
/
Remarks and/or Distribution
~tt:~:ceD;rl~l~eh; ~nr;or~::rSr~r;dstfrr~ummt.Op of ground surface unless otherwise specified. Ienetration denotes
(1) --W.B. KIBLER CONSTRUCTION/SAM CARDWELL
(1 ) --BILL FOWKES m
(1) --CITY OF COPPELL/LEE STONE m
/
LIMITATIONS: The t~ requite pre~ent~d herein were prepared baaed upon the epecific eemple~ provided for t~ting. We m ..u~.e n
quality (compgmition, Ippeorlnce, porformlnce, etc.) or iny other feature of Ilmlllr lUbleCt melter provl,'led by perlOf~l m' cond~llerll
Our letterl end i~lportl Ire for the exclusive [me of the clientl to whom they ere eddre~ed.
c:\wpwin\forms\pier-sft.rpt-95/kjh
) re~pert~ibitity for veriation in
over which we have no control.
April 20, 1995