Latter-day-LR 950420 (4)Rone Engineers
Geotechnical Consultants
Materials Testing
RoneEn ineers
/
Drilled Pier Report . / '
Project Pufchase Order
CHURCH OF JESUS CHRIST LATTER DAY SAINTS
Number I Date of Observation 04/14/95 Re~3ort Date 04/20/95
Building Structure ' I Engineer/Technician BOBBY RtY S.E,T,
I
/
SPECIFICATIONS .. ACTUAL
Shaft Shaft Depth to
Diameter Penetratio Foot- Diameter Bearing.~| Penetration Total
Test No. Pier No. (in.) n (ft.) note (in.) Stratum
(ft.)
Depth
39 39 18 3.0 18 12.0 / i 3.0 15.0
/
40 40 18 3.0 18 11.2 / 3.2 14.4
I
/
i 18 3.0 18 9.5 ! 3.0 12.5
,.
77 , 77 18 3.0 I 18 8.5 i 3.0 11.5
78 78 18 3.0 18 8.7 /i 3.0 11.7
/
79 79 18 ! 3.0 18 7.8 3.0 10.8
/
I
Remarks and/or Distribution "
~j~;;~eD;~ltleh; ~;:rSi~r;dstfrr~ummt.Op of ground surface unless otherwise specified, l~enetration denotes
NOTE: REINFORCING STEEL WAS NOTED AS 4 #5 VERTICAL BARS /
/
DISTRIBUTION: (1) --JOHN R. HORTON
(1) --W.B. KIBLER CONSTRUCTION/SAM CARDWELL
(1 ) --BILL FOWKES
(1) --CITY OF COPPELL/LEE STONE
/
LIMITATIONS: The te~t reeut~ pr~ented herein were prepared b~ ~on t~ s~cific s~pl~ prov~ for t~. We ~e m
quMiW (comp~tion, ap~ce, ~rf~m~ce, etc. J or ~y ot~r feat~e of limillr su~e~ m~er ~ovid~ by ~mo~ ~ co~itio~
O~ ~tterl ~ rep~ ire for t~ excl~ve ~ of t~ clientl to whom t~y ~e ~dr~.
c:\wpwin\forms\pier-sft.rpt-95/kjh
reel~or.ibility for varietion in
wer which we have no control.
April 20, 1995