Loading...
Latter-day-LR 950420 (4)Rone Engineers Geotechnical Consultants Materials Testing RoneEn ineers / Drilled Pier Report . / ' Project Pufchase Order CHURCH OF JESUS CHRIST LATTER DAY SAINTS Number I Date of Observation 04/14/95 Re~3ort Date 04/20/95 Building Structure ' I Engineer/Technician BOBBY RtY S.E,T, I / SPECIFICATIONS .. ACTUAL Shaft Shaft Depth to Diameter Penetratio Foot- Diameter Bearing.~| Penetration Total Test No. Pier No. (in.) n (ft.) note (in.) Stratum (ft.) Depth 39 39 18 3.0 18 12.0 / i 3.0 15.0 / 40 40 18 3.0 18 11.2 / 3.2 14.4 I / i 18 3.0 18 9.5 ! 3.0 12.5 ,. 77 , 77 18 3.0 I 18 8.5 i 3.0 11.5 78 78 18 3.0 18 8.7 /i 3.0 11.7 / 79 79 18 ! 3.0 18 7.8 3.0 10.8 / I Remarks and/or Distribution " ~j~;;~eD;~ltleh; ~;:rSi~r;dstfrr~ummt.Op of ground surface unless otherwise specified, l~enetration denotes NOTE: REINFORCING STEEL WAS NOTED AS 4 #5 VERTICAL BARS / / DISTRIBUTION: (1) --JOHN R. HORTON (1) --W.B. KIBLER CONSTRUCTION/SAM CARDWELL (1 ) --BILL FOWKES (1) --CITY OF COPPELL/LEE STONE / LIMITATIONS: The te~t reeut~ pr~ented herein were prepared b~ ~on t~ s~cific s~pl~ prov~ for t~. We ~e m quMiW (comp~tion, ap~ce, ~rf~m~ce, etc. J or ~y ot~r feat~e of limillr su~e~ m~er ~ovid~ by ~mo~ ~ co~itio~ O~ ~tterl ~ rep~ ire for t~ excl~ve ~ of t~ clientl to whom t~y ~e ~dr~. c:\wpwin\forms\pier-sft.rpt-95/kjh reel~or.ibility for varietion in wer which we have no control. April 20, 1995