Latter-day-LR 950420 (6)Rone Engineers
Geotechnical Consultants
Materials Testing
'" R°neEn ineerS
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number I Date of Observation
D4251B-058 IMAR 15, 1995
To
JOHN R. HORTON, ARCHITECT
IPurchase Order
RTort Date
04120/95
Location
PLATFORM SLAB - 10' WEST & 8'S OF NORTHEAST CORNER
Contractor
W. B. KIBLER CONSTRUCTION
SupplierTxl I 43Plant I Truck472
Mix Number I Mix Description
I
46
Weather Conditions CLOUDY Ambient Temperature (°F)
63
I C;ncrete Temperature (°F)
5
41A 7 3/22/95 103000
41 B 28 4/12/95 132000
41C 28 4/12/95 127500
41D HOLD HOLD
Concrete Cylinder Test(s)
ACTUAL SPEC IFICATIONS
No. (Days) (lbs.) Strength (psi)
Streng
Curing Method Test Method
ASTM C 31 ASTM C 39
Remarks and/or Distribution
IStandard 6" x 12" I
Area 28.27 sq. in.
Distribution: (1) --JOHN R. HORTON
(1) -- W.B. KIBLER CONSTRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
LIMITATIONS: The te~t r~ult~ pre~nte~ herein were prepared baeed ul~on the sl~ecific sample~ provided for te~ing. We mume no
quality (compeeiti~ ep~e, ~form~e, etc.) or ~y ot~r felture of Nmil~ I~ me.er ~ov~ed by ~ or co~i6o~
O~ leW ~ re.ti are for t~ excl~ve ~ of t~ clle~ to w~ t~y ~e ~dr~.
c:\wpwin\forms\cylinder.rpt-95/kjh
IFICATIONS
th Required (psi)
364O 300O
467O
4510
Engineer/Technician KEVIN TUCKER
re~por~ibility fir variafien in
wet which wi hive ne cemrel.
April 20, 1995
SLUMP (in.) -- 4"
Time Sampled I Water Added
9:50 AM I 0.0 GALS
Physical Data
ACTUAL SPEC