Latter-day-LR 950420 (7)Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
TESTED FOR: JOHN HORTON
REPORT DATE: 04/20/95
SAMPLE DATE: 04/14/95
FIELD DATA:
I
No of
Set I Cylinders
LOCATION:
Concrete
Supplier Ticket
Number
363376
REPORT OF FIELD INSPECTION OF CONCRETE
Time Truck
Batched
CHURCH OF JESUS CHRIS'
PROJECT:
OUR REPORT NO. D4251B-063
Yards of
Concrete
Water
Added
10
Slump
(In)
4 1/2
Time Truck
Unloaded
12:35
ineers
LATTER-DAY SAINTS
Ambient
Temp
oF
10
11:20
78
Air
Content
(%)
Concrete
Temp
oF
83
43 SOUTH PERIMETER WALL PIERS (9 THRU 17)
REMARKS:
Rone Engineers, Inc.