Latter-day-LR 950425Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
REPORT OF FIELD INSPECTION OF CONCRETE
/
TESTED FOR: JOHN HORTON PROJECT: CHURCH OF JESUS CHRISl LATTER-DAY SAINTS
/
REPORT DATE: 04/25/95 /
/
SAMPLE DATE: 04/21/95 OUR REPORT NO. D4251B-066
/
FIF113 DATA: Water /
No of Concrete / Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump ! Content Temp Temp
No Made Number Batched Unloaded Concrete '(Gal) (In) / {%) °F °F
44 4 . 366684 1:37 I 2:10 I 10 0 4 1/4 4.75 79 75
LOCATION:
44 PAVING - EAST APPROACH - CURB ON NORTH SIDE OF ISLAND
REMARKS:
Rone Engineers, Inc.