Loading...
Latter-day-LR 950425Rone Engineers, Inc. Geotechnical Consultants Materials Testing REPORT OF FIELD INSPECTION OF CONCRETE / TESTED FOR: JOHN HORTON PROJECT: CHURCH OF JESUS CHRISl LATTER-DAY SAINTS / REPORT DATE: 04/25/95 / / SAMPLE DATE: 04/21/95 OUR REPORT NO. D4251B-066 / FIF113 DATA: Water / No of Concrete / Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump ! Content Temp Temp No Made Number Batched Unloaded Concrete '(Gal) (In) / {%) °F °F 44 4 . 366684 1:37 I 2:10 I 10 0 4 1/4 4.75 79 75 LOCATION: 44 PAVING - EAST APPROACH - CURB ON NORTH SIDE OF ISLAND REMARKS: Rone Engineers, Inc.