Loading...
Latter-day-LR 950425 (2)Rone Engineers Geotechnical Consultants Materials Testing RoneEn ineerS Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number IPlrchase Order Rl )orr Date D4251B-064 IDate of Obse~ation APRIL 14,1995 To JOHN R. HORTON, ARCHITECT Location PIERS - SOUTH PERIMETER WALL (9 THRU 17) Contractor '; W. B. KIBLER CONSTRUCTION Supplier Plant I Truck I Tlcket TXI 31 N/A I 313376 Mix Number Mix Description 8273 Weather Conditions CLEAR Time Sampled I Water Added 12:15 PM I 0.0 GALS Physical Data 04/25/95 Ambient78 Temperature (°F) )ncrete Temperature (°F) 33 ACTUAL SPE(:IFICATIONS SLUMP (in.) -- 4 1/2 Concrete Cylinder Test(s) ACTUAL SPE(;IFICATIONS Specimen Age I I No. (Days) Test Date Tot Load Compressive (lbs.) Strength (psi) 109500 3870 4000 43A 7 4/21/95 43B 28 5/12/95 43C 28 5/12/95 43D HOLD HOLD Curing Method Test Method ASTM C 31 ASTM C 39 IStandard 6" x 12" Engineer/Technician Area 28.27 sq. in. Remarks and/or Distribution Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWKES {1) -- CITY OF COPPELL Stren BOBB' LIMITATIONS: The te~t reauitl pre~ented h~ein were prepared bued upon the specific samplea provided for te~ting. We a~ume n, quNiW {compoliticn, epgearlnce, performance, Itc.} or any other feature ef llmilar lubiect metter provided by pereoc~ or cenditionl Ou~ lettarl and reportl are for the exclullve use of the client~ to whom they Ire eddres~ed. :h Required (psi) RAY , re~peneibility for varietion in ever which we hive no contrel.