Latter-day-LR 950425 (2)Rone Engineers
Geotechnical Consultants
Materials Testing
RoneEn ineerS
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
IPlrchase Order
Rl )orr Date
D4251B-064
IDate of Obse~ation
APRIL 14,1995
To
JOHN R. HORTON, ARCHITECT
Location
PIERS - SOUTH PERIMETER WALL (9 THRU 17)
Contractor
';
W. B. KIBLER CONSTRUCTION
Supplier Plant I Truck I Tlcket
TXI 31 N/A I 313376
Mix Number Mix Description
8273
Weather Conditions CLEAR
Time Sampled I Water Added
12:15 PM I 0.0 GALS
Physical Data
04/25/95
Ambient78 Temperature (°F)
)ncrete Temperature (°F)
33
ACTUAL SPE(:IFICATIONS
SLUMP (in.) -- 4 1/2
Concrete Cylinder Test(s)
ACTUAL SPE(;IFICATIONS
Specimen Age I I
No. (Days) Test Date Tot Load Compressive
(lbs.) Strength (psi)
109500 3870
4000
43A 7 4/21/95
43B 28 5/12/95
43C 28 5/12/95
43D HOLD HOLD
Curing Method Test Method
ASTM C 31 ASTM C 39
IStandard 6" x 12" Engineer/Technician
Area 28.27 sq. in.
Remarks and/or Distribution
Distribution: (1) --JOHN R. HORTON
(1) -- W.B. KIBLER CONSTRUCTION
(1) -- BILL FOWKES
{1) -- CITY OF COPPELL
Stren
BOBB'
LIMITATIONS: The te~t reauitl pre~ented h~ein were prepared bued upon the specific samplea provided for te~ting. We a~ume n,
quNiW {compoliticn, epgearlnce, performance, Itc.} or any other feature ef llmilar lubiect metter provided by pereoc~ or cenditionl
Ou~ lettarl and reportl are for the exclullve use of the client~ to whom they Ire eddres~ed.
:h Required (psi)
RAY
, re~peneibility for varietion in
ever which we hive no contrel.