Loading...
Latter-day-LR 950501 (2)Rone Engineers GeotechnicaJ Consultants Materials Testing neEn ineers GENERAL REPORT Project CHURCH OF JESUS CHRIST OF LATTER DAY SAINTS Number ISample Date IRel D4251 B-071 04/28/95 JOHN HORTON, ARTCHITECT Report of CYLINDER COLLECTION Identification Method of Test Results On the above listed date Bobby Ray, representing Rone Engineers, In project site to pick up concrete cylinders cast on 4/27/95 for comprE testing. )ort Date 05/01/95 ,~one Engineers c., arrived at the ~ssive strength