Latter-day-LR 950501 (2)Rone Engineers
GeotechnicaJ Consultants
Materials Testing
neEn ineers
GENERAL REPORT
Project
CHURCH OF JESUS CHRIST OF LATTER DAY SAINTS
Number ISample Date IRel
D4251 B-071 04/28/95
JOHN HORTON, ARTCHITECT
Report of
CYLINDER COLLECTION
Identification
Method of Test
Results
On the above listed date Bobby Ray, representing Rone Engineers, In
project site to pick up concrete cylinders cast on 4/27/95 for comprE
testing.
)ort Date
05/01/95
,~one Engineers
c., arrived at the
~ssive strength