Loading...
ST0004-LR010824 (3) 'IT~I~B,~I~[ GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables In., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 ---- ~ Concrete Compression Test Report Client: The City of Coppell Report Distribution: (1) The City of Coppell Project: Freeport Parkway Pavement (1) Quantam Contracting Repair TMI Report No.: DC01-066-040 Report Date: 08/24/2001 Specifications Test Data Strength 4000 psi @ 28 Days Placement Date 08/09/2001 Slump 5 in max Sampled By Zuhair Shubbar Air Content 3 % min 6 % max Weather Pt. Cloudy / Windy Concrete Temperature n/a Supplier/Mix Hanson/9636 Ambient Temperature n/a Air Content Method ASTM C-231-B Ticket Number: 937694 Time Batched: 2:35 pm Time Sampled: 3:35 pm Slump: 5 in Air Content: 4.6 % Unit Weight: n/a Concrete Temperature: 99° F Ambient Temperature: 98° F Yardage (c.y.): 100 of 100 Placement Location: Paving Sample Location: Intersection of Airline & Freeport Pkwy. Cyl~der Age. Max Load Area Strength Fracture Set Test Date (days) (lbs. force) (sq.in.) (psi'~ Type 2 08090107 08/16/2001 7 104240 28.27 3690 unbonded cap 2 08090108 08/16/2001 7 110050 28.27 3890 unbonded cap 2 08090109 09/06/2001 28 2 08090110 09/06/2001 28 2 08090111 Hold 2 08090112 Hold Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. ~-.\. ......... ,.....~..,~ TERRA-MAR, INC.  Sr. Vice President The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of TMI. P.~g¢ 2 or'2