Loading...
WA9302-LR 951227 (2)I'~'EOTECHNICAL E GEE Consultants, Inc. EI NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: December 27, 1995 Date Concrete Placed: November 7, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank concrete Report No.: 44 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Piers MATERIALS s ....~ ~ '~. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: Time Sample Batehe& 9:30 mn Cement: Time Sampled: 9:55 am Sample Location: Pier No. B.84.5 Fly Ash: Truck/Ticket No: 192/14125 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 60°F Fine Aggregate: Concrete Range: 65°F Slump Range (inches): 4" Admixtures: Weather Conditions: Cloudy 1 Time Started: 2 Time Completed: Added Water: 45 gal. water on the job Sample Air Content (%): No Test Total Cubic Yards Placed: 7.75 C.Y. Required Strength (Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Load Compressire Strength Remarks Number Slump (in.) (Days) Teste~l (Lbs.) (Lbs./Sq.ln.) CWT 177 4" 7 11 / 14/95 113, 100 4,000 CWT 178 4" 7 11/14/95 115,460 4,080 CWT 179 4" 28 12/06/95 164,840 5,830 CWT 180 4" 28 12/06/95 158,540 5,610 __ Test Methods Utilized I Fracture Regular Cylinders Made By: P. Chen ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks and/or Distribution: co: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendrieks - ShimeL Jacobs and Finklea ~ ~s~tl. tss. tsh, lna. Rmvi. mwed by: