Loading...
Latter-day-LR 950502 (2)Rone Engineers Geotechnical Consultants Materials Testing R°neEn. ineers / Drilled Pier Report Project P~rchase Order CHURCH OF JESUS CHRIST OF LATTER DAY SAINTS Number I Date of Observation 4127195 R~port Date 05/02/95 D425~-o68 I Building Structure I Engineer/Technician PAUL ST1WELL SPECIFICATIONS, . ACTUAL Shaft ! Shaft' Depth to ! Diameter Penetra- i Foot- Diameter Bearing ! Penetration Total Test No. Pier No. (in.) teen (ft.) i note (in.) Stratum (ft.)I (ft.) Depth (ft.) ' 74 18 3,0 i 18 7,5 ! 3,5 11.0 72 18 3,0 18 9,5 / 3,0 12,5 71 18 3,0 : 18 8,0 ! 3,0 11,0 70 18 3.0 18 8,0 ! 3.0 11.0 69 18 3.0 18 7.5 ! 3.0 10.5 68 18 3.0 18 7,0 ! 3,5 10,5 , 67 18 3,0 18 7,0 ! 3,5 10.5 66 18 3,0 18 7,4 ! 3,1 10,5 65 18 -.3,0 18 8 0 / 3.0 11.0 i ~8 ~8 3.0 ~ 7.~ / 3.~ ~ ~.o 60 18 3.0 18 9.0 / / Remarks and/or Distribution Notes: Depths are measured from top of ground surface unless otherwise specified. I~enetration denotes distance drilled into bearing stratum. BEARING MATERIAL: GRAY SHALE / / DISTRIBUTION: (1) -- JOHN R, HORTON (1) -- W,B. KIBLER CONSTRUCTION/SAM CARDWELL m (1) -- BILL FOWKES m (1) -- CITY OF COPPELL / / LIMITATIONS: The teat reeulte preeented herein were prepared baaed upon the specific .arnples provided for te~ting. We aesume n( quality (completion, eppea~'ance, performance, etc.) or any other feature of almilar subject matter provided by pereon~ er conditione Ou~ lettera and raport~ ara for the exclusive u~e of the clienta to whom they are eddre~ed. c:\wpwin\forms\pier-sft.rpt-95/kjh ~porteibility for v~iJti~n in .vet which we have no control. May 2, 1995