Latter-day-LR 950503Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Proiect
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
IPlrchase Order
Rl ~ort Date
D4251B-067
IDate of Observation
APRIL 21,1995
To
JOHN R. HORTON, ARCHITECT
Location
EAST APPROACH - CURB - NORTH SIDE OF ISLAND
Contractor
W. B. KIBLER CONSTRUCTION
Supplier
ITruck
466
ITlcket
316684
05/03/95
Plant
TXI 41
Mix Number Mix Description
8273
CLEAR
Weather Conditions
Ambient Temperature (°F)
79
Time Sampled I Water Added
1:50 PM I 0.0 GALS
lC )ncrete
75
Temperature (°F)
Physical Data
ACTUAL SPE( :IFICATIONS
SLUMP (in.) -- 4 1/4
ENTRAINED AIR (%) -- 4.75
Concrete Cylinder Test(s)
Specimen
No.
ACTUAL
SPE(
4000
Stren
44A 7
44B 28
44C 28
44D HOLD
(Days) (lbs.) Strength (psi)
4/28/95 100000 3540
5/19/95
5/19/95
HOLD
IEngineer/Technician
TIM C
Curing Method I Test Method
ASTM C 31I ASTM C 39
Remarks and/or Distribution
IStandard 6" x 12"
Area 28.27 sq. in.
Distribution: (1) --JOHN R. HORTON
(1) -- W.B. KIBLER CONSTRUCTION
(1) -- BILL FOWl(ES
(1) -- CITY OF COPPELL
LIMITATIONS: The teet re~.dta i~re~ented herein were prel~ired ba~ed upon the el~ecific aamplea provided for teacing. We a~ume n
quality (ceml~oeitien, appearance, performance, etc.) of any other feature of aimilor subject matter provided by pereorm of conditioml
Our lettorl and rel3ortl ire for the exclueive uae of the clionte to where they ire addre~led.
c:\wp win\forms\cylinder.rpt-95/kjh
:IFICATIONS
th Required (psi)
rKE
re~l~oneibility for virietidn in
which we have no control,
May 3, 1995