Loading...
Latter-day-LR 950503Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Proiect CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number IPlrchase Order Rl ~ort Date D4251B-067 IDate of Observation APRIL 21,1995 To JOHN R. HORTON, ARCHITECT Location EAST APPROACH - CURB - NORTH SIDE OF ISLAND Contractor W. B. KIBLER CONSTRUCTION Supplier ITruck 466 ITlcket 316684 05/03/95 Plant TXI 41 Mix Number Mix Description 8273 CLEAR Weather Conditions Ambient Temperature (°F) 79 Time Sampled I Water Added 1:50 PM I 0.0 GALS lC )ncrete 75 Temperature (°F) Physical Data ACTUAL SPE( :IFICATIONS SLUMP (in.) -- 4 1/4 ENTRAINED AIR (%) -- 4.75 Concrete Cylinder Test(s) Specimen No. ACTUAL SPE( 4000 Stren 44A 7 44B 28 44C 28 44D HOLD (Days) (lbs.) Strength (psi) 4/28/95 100000 3540 5/19/95 5/19/95 HOLD IEngineer/Technician TIM C Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution IStandard 6" x 12" Area 28.27 sq. in. Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWl(ES (1) -- CITY OF COPPELL LIMITATIONS: The teet re~.dta i~re~ented herein were prel~ired ba~ed upon the el~ecific aamplea provided for teacing. We a~ume n quality (ceml~oeitien, appearance, performance, etc.) of any other feature of aimilor subject matter provided by pereorm of conditioml Our lettorl and rel3ortl ire for the exclueive uae of the clionte to where they ire addre~led. c:\wp win\forms\cylinder.rpt-95/kjh :IFICATIONS th Required (psi) rKE re~l~oneibility for virietidn in which we have no control, May 3, 1995