Loading...
ST0004-LR010823 (2) '~NL~I~ GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 - Concrete Compression Test Report Client: The City of Coppell Report Distribution: (1) The City of Coppell Project: Freeport Parkway Pavement (1) Quantam Contracting Repair TMI Report No.: DC01-066-029 Report Date: 08/23/2001 Specifications Test Data Strength 4000 psi @ 28 Days Placement Date 07/26/2001 Slump 5 in max Sampled By Zuhair Shubbar Air Content 3 % min 6 % max Weather Pt. Cloudy / Windy Concrete Temperature n/a Supplier/Mix Hanson/9636 Ambient Temperature n/a Air Content Method ASTM C-231-B Ticket Number: 937174 Time Batched: 3:09 pm Time Sampled: 4:05 pm Slump: 7 in* Air Content: 5.5 % Unit Weight: n/a Concrete Temperature: 97° F Ambient Temperature: 96° F Yardage (c.y.): 119 of 150 Placement Location: Paving Sample Location: North, Freeport Pkwy., at Statio 5+00, end An asterisk (*) appears next to field data which does NOT meet specifications. Set # Cyl~der Age Max Load Area Strength Fracture Test Date (days) (lbs. force) (sq.in.) (psi~ Type 2 07260107 08/02/2001 7 102180 28.27 3610 unbonded cap 2 07260108 08/02/2001 7 92760 28.27 3280 unbonded cap 2 07260109 08/09/2001 14 111940 28.27 3960 unbonded cap 2 07260110 08/09/2001 14 105140 28.27 3720 unbonded cap 2 07260111 08/23/2001 28 125270 28.27 4430 unbonded cap 2 07260112 08/23/2001 28 127880 28.27 4520 unbonded cap 28 day average 4480 Normal cylinder size: 6"x 12" and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231~%~ Field TERRA-MAR, INC.  Sn ~m~r~id~t lbo results presonte0 in this re~ort pertaia only to the specific itoms testo0. This report was Oroduced for the oxclusivo use of the client. Any reproduction of this report, or any ~a~ therein, is strictly prohibited without tho oxpress written consent o[ TMI. Page 2 of 2