Loading...
Latter-day-LR 950508Rone Engineers, Inc. Geotechnical Consultants Materials Testing Rc)neEngineers REPORT OF FIELD INSPECTION OF CONCRETE TESTED FOR: JOHN HORTON PROJECT: CHURCH OF JESUS CHRI.(;T LATTER-DAY SAINTS REPORT DATE: 05/08/95 SAMPLE DATE: 05/01/95 OUR REPORT NO. D4251B-072A FIELD DATA: No of Concrete Water Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump Content Temp Temp No Made Number Batched Unloaded Concrete (Gal) (In) (%) °F °F 46 4 372107 8:52 N/A 10 0 4 1/2 N/A 66 76 LOCATION: 46 PIER #J REMARKS: Rone Engineers, Inc.