Loading...
WA9302-LR 951222[EOTECHNICAL E GEE Consultants, Inc. EI NVI RONMENTAL Suite ]08 ~ ........ REPORT OF CONCRETE MIX INSPECTION oa Date: December 22, 1995 Date Concrete Placed: October 4, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Ta~ Concrete Repoa No.: 22 Coutractor: Natgun Contraction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant ~1 Location of Placement: Piers ~TERIALS ~o~.~, ~" ~' INSPECTION DATA Description (lbs./0.075 C.Y) Mix Nmber: 686 Time Sgple Batched: 8:09 ~ Time Smpled: 9:05 ~ Cement: Sample Location: Pier Fly Ash: TrucNTicket No: 127/11796 Coarse Aggregate: Temperature: Intermediate Aggregate: gbient Range: 55~F Concrete Range: 65~F Fine Aggregate: Slump Range (inches): 5" Admixtures: Wea~er Conditions: Su~y I Time Started: 2 Time Completed: Sgple Air Content (%): No Test Added Water: Total Cubic Y~ds Placed: 7.75 C.Y. Required Strength (Lbs./sq.in.): 4,000 Compressive Specimen Measured Age Date Total Load Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.h.) CWT 89 5" 7 10/11/95 127,560 4,510 CWT 9O 5" 7 10/11/95 130,400 4,610 CWT 91 5" 28 11/08/95 172,140 6,090 CWT 92 5" 28 11/08/95 169,460 5,990 Test Melhods Utilized Fracture Regular Cylinders Made By: P.Chen ASTM C-31,C-39,C-143 (Uffiess Noted Otherwise) Remarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, lacobs and Finklea Mr. Gary Herron - RediMix Concrete C~/~ ~ d-~/"" ~3EE o~---ultants, Inc. Reviewed by: ~ All letr~eF~ arid reKorts are for the exclusive use of the client to whom they a~'e addressed and shall not be reproduced without the full aK~nzcvil ,.!f GlEE Colus~ltants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only te the sam[le tested and/c~ inspected and are not necessarily !nd!cat~-ve of the quantities o[ apparently identical or similar ireducts.