Loading...
Latter-day-LR 950510Rone Engineers Geotechnical Consultants Materials Testing '- R°neEn l Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number IDate of Observation APRIL 27, 1995 IPulchase Order RTort Date D4251B-070 05/10/95 To JOHN R. HORTON, ARCHITECT Location SCREEN WALL - DRILL SHAFTS //47 THRU //53 Contractor .. W. B. KIBLER CONSTRUCTION SupplierTXI IPlant 41 ITruck N/A IITi( 37 Mix Description Mix Number 8273 Weather Conditions PARTLY CLOUDY Time Sampled Water Added 2:30 PM 0.0 GALS Ambient Temperature (°F)69 IC7~ ket ~471 ncrete Temperature (°F) Physical Data ACTUAL SPEC IFICATIONS SLUMP (in.) -- 4 1/4 '. Concrete Cylinder Test(s) ACTUAL SPEC IFICATIONS Tot Load Compressive SpecimenNo. (Days)Age I Test Date 45A 7 5/04/95 45B 28 5/25/95 45C 28 5/25/95 45D HOLD HOLD Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution (lbs.) Strength (psi) 92000 3250 4000 Standard 6" x 12" Engineer/Technician Area 28.27 sq. in. Distribution: (1) -- JOHN R. HORTON (1) -- W,B. KIBLER CONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL Strength Required (psi) LIMITATIONS: The tilt relulte presented herein were prepared baled upon the specific slmple~ provided far te~ting, We assume no quality (cornpo~ition, i~pearlnce, performance, etc.) or any other feature of similar subject matter provided by persons or conditions Our letters end report~ Ire for the exclusive ual of the clients to whom they are ~ddrasaed. c:\wpwin\forms\cylinder.rpt-95/kjh PaUL ;TOWELL responsibility for variation in war which we hive rio control. May 10, 1995