Loading...
Latter-day-LR 950510 (2)RoneEn neers Drilled Pier Report / . Project P~rchase Order CHURCH OF JESUS CHRIST LATTER DAY SAINTS Number I Date of Observation 05/01/95 R~port Date 05/10/95 D4251B-072 I T° JOHN HORTON, ARCHITECT Building Structure I Engineer/Technician KEVIN TI~CKER FENCER WALL NW SIDE OF BUILDING I SPECIFICATIONS ACTUAL Shaft Shaft'~ Diameter Penetratio Foot- Diameter i Bearing ! Penetration l Total Test No. Pier No. (inl) i n (ft.) note (in.) Stratum (ft.)I (ft.) ! Depth (ft.) 37 K1 18 3.0 18 5.5 ! 3.6 9.1 38 L1 18 3.0 18 5.7 |i 3.8 ' 9.5 39 M1 18 3.0 18 6.4 / 3.1 9.5 40 N1 18 3.0 18 6.2 ! 3.4 9.6 ~,~ ~1 18 3.0 18 8.7 / 3.4 12.1 / 42 P1 18 ! 3.0 18 10.0 / 3.7 13.7 43 Q1 18 3.0 18 9.7 ! 3.2 12.9 44 al 1 8 3.0 18 9.6 ! 3.2 12.8 45 Sl 18 '.3.0 18 10.8 ! 3.7 14.5 46 T1 18 3.0 18 10.1 ! 3.4 13.2 47 U1 18 3.0 18 8.7 ! 3.3 12.0 48 Vl 18 3.0 18 9.7 3.4 13.1 Remarks and/or Distribution L ' Notes: Depths are measured from top of ground surface unless otherwise specified. ~enetration denotes distance drilled into bearing stratum. / / DISTRIBUTION: (1) --JOHN R. HORTON (1) --W.B. KIBLER CONSTRUCTION/SAM CARDWELL (1 ) --BILL FOWKES (1) --CITY OF COPPELL/LEE STONE / / UMITATIONS: The te~t ruult~ i~'e~ented herein were prepared based upon the *~cific sampl~ provid~ for t~ti~. We ~ume n, q~ity (comp~ition, ~M~, performs, etc.) or ~y ot~r felt~e of Ilmlllr subject matter prov~d~ by ~rao~ or CO~ltlOM O~ lett~ i~ rep~ Ire for t~ excl~ive ~e of t~ ctienta to whom t~y 4~e ~dre~d. c:\wpwin\forms\pier-sft.rpt-95/kjh ~ respomiibility for va~iition in var which we hive no control. May 10, 1995