Loading...
Latter-day-LR 950510 (3)Rone Engineers Geotechnical Consultants Materials Testing ~ R°neEn~~ / Drilled Pier Report Project Pufchase Order CHURCH OF JESUS CHRIST LATTER DAY SAINTS Number I Date of Observation 05/01/95 Re~3ort Date 05/10/95 D4251 B-072 I / To JOHN HORTON, ARCHITECT l Building Structure I Engineer/Technician KEVIN TLI~KER FENCER WALL NW SIDE OF BUILDING I SPECIFICATIONS . AC'I~UAL Shaft Shaft" Depth to / DiameterI Penetratio Foot- Diameter Bearing / Penetration Total Test No. Pier No. (in.) n (ft.) I note (in.) Stratum (ft,)l, (ft.) Depth (ft.) 19 S 18 3.0 18 2.8 / 4.2 7.0 20 T 18 3.0 18 ' 2.7 / 4.1 6.8 21 u 18 3.0 ~8 3.3 / 3.3 6.6 / 2~ x 18 3.0 18 3.~ / 3,6 7.~ 27 Al 1 8 '3.0 18 4.3 ! 3.2 7.5 28 i B1 18 3.0 18 4.5 I! 3.1 7.6 29 C1 18 3.0 18 5.0 / 3 2 i 8.2 30 91 18 ! 3.0 , 18 5.2 / 3.0 8.2 31 E1 18 3.0 i 18 5.0 / 3.8 8,8 32 F1 18 30 ! ~8 , 5.4 / 3.5 8.9 33 G1 18 3.0 18 5.4 I 3.6 9.0 34 H1 18 3.0 18 5.2 / 3.0 8.2 35 I1 18 3.0 18 5.5 I 3.4 8.9 36 J1 18 3.0 18 5.7 I 3.4 9.1 I Remarks and/or Distribution Notes: Depths are measured from top of ground surface unless otherwise specified. I~enetration denotes distance drilled into bearing stratum. / / DISTRIBUTION: (1) --JOHN R. HORTON (1) --W.B. KIBLER CONSTRUCTION/SAM CARDWELL (1) --BILL FOWKES (1) --CITY OF COPPELL/LEE STONE / UMITATIONS: The teat resulta presented herein were i~'epIred bl~ed u~on the specific samplel ixovided fa` tilting. We a~ume nc qullity (compo~tion, ippearance, performlnce, etc.] or any other feature of similar subject matter provided by pet~n~ or conditJone Our letters and reports Ire fa' the exclulive u~e of the clients to whom they ire ~ddre~ed. c:\wpwin\forms\pier-sft.rpt-95/kjh eapormibility for vIriition in 3var which we hive no control. May 10, 1995