Loading...
Latter-day-LR 950510 (4)Rone Engineers Geotechnical Consultants Materials Testing Drilled Pier Report Project P~rchase Order CHURCH OF JESUS CHRIST LATTER DAY SAINTS Number I Date of Observation 05/01/95 Rtport Date 05/10/95 D425~B-O72 I | T° JOHN / HORTON, ARCHITECT / Building Structure I Engineer/Technician KEVIN T~CKER FENCER WALL NW SIDE OF BUILDING I / SPECIFICATIONS .. ACTUAL I Shaft Shaft' i Depth to ~ Diameter Penetratio !Foot- Diameter Bearing ! Penetration Total Test Nc, Pier No. (in.) i n (ft.) note (in.) I Stratum (ft.)I (fi,) Depth (ft.) 1 A 18 ' 3.0 18 4.4 ! 3.1 7.5 2_ i B , 18 3.0 18 4.1 ! 3.2 7.3 3 C 18 I 3.0 18 4.2 I 3.3 7.5 ,, D ~e J 3.0 ~8 4,7 m ~ ~ ~8 3.° ~8 ~.~ ! ' / 6 F 18 3.0 18 3.0 m 4,0 7,0 7 G 18 3.0 18 2.~ m 5,0 7,5 8 H 18 -3.0 18 2,~ m 4.3 6.9 9 I 18 : 3.0 18 2.3 m ~,3 6.6 10 j 18 3.0 18 2.7 m 4.0 6,7 11 K 18 3.0 18 3.5 m 3.3 6.8 12 L 18 3,0 18 3,7 m 3.0 6.7 13 M 18 3.0 18 ~.0 m 3.1 7.1 1~ N ~8 3.o ~8 3,o m 3.9 6,9 15 o 18 3,o ~8 3.2 m 3,8 m 7,0 ~6 P ~8 3.O 18 3,~ m 3,8 " 7,1 17 O 1~ 3,O 1~ 2,~ m 3,~ 7,o ~8 , i ,8 3.o ~8 3.~m 3.8 ~.. Remarks and/or Distribution L Notes: Depths are measured from top of ground surface unless otherwise specified. ~enetration denotes distance drilled into bearing stratum, m m DISTRIBUTION: (1) --JOHN R, HORTON m (1) --W.B. KIBLER CONSTRUCTION/SAM CARDWELL m (1 ) --BILL FOWKES m (1) --CITY OF COPPELL/LEE STONE m m LIMITATIONS: The tost rosulta prosent~t herein ware prepared ba~ed upon the specific samplos provided for te~ting. Wa muml quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by pereon~ or conditio¢ OU~' lattara and roporte ire for the exclusive u~e of the clients to whom they are addressed. c:\wpwin\forms\pier-sft.rpt-95/kjh responeibility for variedon in over which we hive no control. May 10, 1995