Latter-day-LR 950512Rone Engineers
Geotechnical Consultants
Materials Testing
R°neEngineers
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
D4251 B-073
IDate of Observation
MAY 01, 1995
To
JOHN R. HORTON, ARCHITECT
Location
PIERS #J
Contractor
W. B. KIBLER CONSTRUCTION
IP~rchase Order
Rlport Date
05/12/95
Supplier
IPlant I Truck
31 362
TXI
Mix Number Mix Description
8273
CLOUDY
Weather Conditions
Ambient Temperature (°F)
66
Water Added
0.0 GALS
I C7¢ncrete Temperature (°F)
Time Sampled
9:53 AM
Physical Data
ACTUAL SPEC IFICATIONS
SLUMP (in.) -- 4 1/2 '-
Concrete Cylinder Test(s)
ACTUAL SPEC FICATIONS
No. (Days) (lbs.) Strength (psi)
4000
Streni
46A 7 5/08/95
46B 28 5/29/95
46C 28 5/29/95
46D HOLD HOLD
91500 3240
IEngineer/Technician
KEVIN TUCKER
Curing Method I Test Method
ASTM C 31I ASTM C 39
Remarks and/or Distribution
Standard 6" x 12"
Area 28.27 sq. in.
Distribution: (1) --JOHN R. HORTON
(1) --W.B. KIBLER CONSTRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
th Required (psi)
LIMITATIONS: The test re/ultl preesnted herein were prepared baead upon the specific ilmples provided for teltin{I. We eslume nc
quality (cempo~itien, al)pearence, perfm'mance, etc.} or any ether feature of limilar subject ma{te?~'ovided by persona or conditieml
Ou~ letterl and reports ate for the exclLmive u~e of the clients to whom ~hey Ire eddrel~ed.
respormibility for veriltion in
which we hive no contr~4.