Loading...
Latter-day-LR 950512Rone Engineers Geotechnical Consultants Materials Testing R°neEngineers Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number D4251 B-073 IDate of Observation MAY 01, 1995 To JOHN R. HORTON, ARCHITECT Location PIERS #J Contractor W. B. KIBLER CONSTRUCTION IP~rchase Order Rlport Date 05/12/95 Supplier IPlant I Truck 31 362 TXI Mix Number Mix Description 8273 CLOUDY Weather Conditions Ambient Temperature (°F) 66 Water Added 0.0 GALS I C7¢ncrete Temperature (°F) Time Sampled 9:53 AM Physical Data ACTUAL SPEC IFICATIONS SLUMP (in.) -- 4 1/2 '- Concrete Cylinder Test(s) ACTUAL SPEC FICATIONS No. (Days) (lbs.) Strength (psi) 4000 Streni 46A 7 5/08/95 46B 28 5/29/95 46C 28 5/29/95 46D HOLD HOLD 91500 3240 IEngineer/Technician KEVIN TUCKER Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution Standard 6" x 12" Area 28.27 sq. in. Distribution: (1) --JOHN R. HORTON (1) --W.B. KIBLER CONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL th Required (psi) LIMITATIONS: The test re/ultl preesnted herein were prepared baead upon the specific ilmples provided for teltin{I. We eslume nc quality (cempo~itien, al)pearence, perfm'mance, etc.} or any ether feature of limilar subject ma{te?~'ovided by persona or conditieml Ou~ letterl and reports ate for the exclLmive u~e of the clients to whom ~hey Ire eddrel~ed. respormibility for veriltion in which we hive no contr~4.