Loading...
Latter-day-LR 950512 (2)Rone Engineers Geotechnical Consultants Materials Testing '"' R°neEnl Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number IDate of Observation APR. 12, 1995 Plrchase Order Rll)ort Date D4251B-061 To JOHN R. HORTON, ARCHITECT Location SOUTH RETAINING WALL PIERS (1 THRU 8) Contractor W. B. KIBLER CONSTRUCTION Supplier Plant I Truck TXI 31 I N/A Mix Number Mix Description 8273 CLEAR Weather Conditions Ambient75 Temperature (°F) 05/12/95 ncrete Temperature (°F) '8 Time Sampled Water Added 4:20 PM 10.0 GALS Physical Data ACTUAL SPEC:IFICATIONS SLUMP (in.) -- 4 1/4 -. Concrete Cylinder Test(s) Compressive Strength (psi) ACTUAL SpecimenNo. I (Days)Age ITest Date 42A 7 4/19/95 42B 28 5/10/95 42C 28 5/10/95 42D HOLD HOLD TotLoad (lbs.) 93000 112000 110000 tStandard 6" x 12" I Area 28.27 sq. in. Curing Method Test Method ASTM C 31 ASTM C 39 Remarks and/or Distribution SPEC Stren Engineer/Technician BOBB~ RAY c:\wpwin\forms\cylinder.rpt-95/kjh LIMITATIONS: The t#t r#ult~ pre~ented herein were prepared b#ed upon the .pecific semple~ provided fa' t#ting. We a~ume ~ quality (composition, appearance, performance, etc.) or any olher feltUre of simile' subject matter provided by persa'm or conditione Our letters and reports are for the exclusive u~e et the clients to whom they ire ~ddre~med. :IFICATIONS h Required (psi) ~ re, pa'inability for v~iation in May 12, 1995 3290 4000 3960 3890 Distribution: (1) --JOHN R. HORTON (1) --W.B, KIBLER CONSTRUCTION/SAM CARDWELL (1) -- BILL FOWKES (1) -- CITY OF COPPELL/LEE THOMAS