Latter-day-LR 950512 (2)Rone Engineers
Geotechnical Consultants
Materials Testing
'"' R°neEnl
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
IDate of Observation
APR. 12, 1995
Plrchase Order
Rll)ort Date
D4251B-061
To
JOHN R. HORTON, ARCHITECT
Location
SOUTH RETAINING WALL PIERS (1 THRU 8)
Contractor
W. B. KIBLER CONSTRUCTION
Supplier Plant I Truck
TXI 31 I N/A
Mix Number Mix Description
8273
CLEAR
Weather Conditions
Ambient75 Temperature (°F)
05/12/95
ncrete Temperature (°F)
'8
Time Sampled Water Added
4:20 PM 10.0 GALS
Physical Data
ACTUAL SPEC:IFICATIONS
SLUMP (in.) -- 4 1/4 -.
Concrete Cylinder Test(s)
Compressive
Strength (psi)
ACTUAL
SpecimenNo. I (Days)Age ITest Date
42A 7 4/19/95
42B 28 5/10/95
42C 28 5/10/95
42D HOLD HOLD
TotLoad
(lbs.)
93000
112000
110000
tStandard 6" x 12" I
Area 28.27 sq. in.
Curing Method Test Method
ASTM C 31 ASTM C 39
Remarks and/or Distribution
SPEC
Stren
Engineer/Technician BOBB~ RAY
c:\wpwin\forms\cylinder.rpt-95/kjh
LIMITATIONS: The t#t r#ult~ pre~ented herein were prepared b#ed upon the .pecific semple~ provided fa' t#ting. We a~ume ~
quality (composition, appearance, performance, etc.) or any olher feltUre of simile' subject matter provided by persa'm or conditione
Our letters and reports are for the exclusive u~e et the clients to whom they ire ~ddre~med.
:IFICATIONS
h Required (psi)
~ re, pa'inability for v~iation in
May 12, 1995
3290 4000
3960
3890
Distribution: (1) --JOHN R. HORTON
(1) --W.B, KIBLER CONSTRUCTION/SAM CARDWELL
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL/LEE THOMAS