Loading...
Latter-day-LR 950518Reno Engineers Geotechnical Consultants Materials Testing ^ R°neEn ineers Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number D4251 B-064 IDate of Observation APRIL 14, 1995 To JOHN R. HORTON, ARCHITECT Location PIERS - SOUTH PERIMETER WALL (9 THRU 17) Contractor W. B. KIBLER CONSTRUCTION Pulchase Order Relort Date 05/18/95 jTruck N/A Supplier Plant TXI 31 Mix Number Mix Description 8273 Weather Conditions CLEAR Ambient Temperature (°F) 78 Time Sampled I Water Added 12:15 PM I 0.0 GALS Physical Data ACTUAL SPEC SLUMP (in.) -- 4 1/2 '. Concrete Cylinder Test(s) ACTUAL SPEC Specimen Age No. (Days) TestDatel TotLoadI Compressive (lbs.) Strength (psi) 43A 7 4/21/95 109500 3870 43B 28 5/12/95 128000 4530 43C 28 5/12/95 127000 4490 43D HOLD HOLD 4OOO Streng Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution IStandard 6" x 12" Area 28.27 sq. in. Engineer/Technician BOBB~ Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL LIMITATIONS: The test iruuItl pre,anted herein well prepared based upon the specific sample~ provided for te~ting. Wa ~e ne quality (c~p~tion. ip~ce, ~d~mlnce, etc.} or ~y ot~r feature of similar subject matter prov~ by ~rse~ or co~itio~ O~ le~erl a~ reports Ire for t~ excl~ive ~ of t~ clients to whom t~y ire ~dr~. c:\wpwin\forms\cylinder.rpt-95/kjh I C;ncrete Temperature (°F) 3 IFICATIONS IFICATIONS th Required (psi) RAY ree;or~ibility for variation in vet which we have no control. May 18, 1995