Latter-day-LR 950523Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
REPORT OF FIELD INSPECTION OF CONCRETE
RoneEn l .
TESTED FOR: JOHN HORTON PROJECT: CHURCH OF JESUS CHRI ST LATTER-DAY SAINTS
REPORT DATE: 05/23/95
SAMPLE DATE: 05/18/95 OUR REPORT NO, D4251B-077
FIELD DATA:
No of Concrete Water Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Truck Yards of A~lded Slump Content Temp Temp
No Made Number Batched Unloaded Concrete (Gal) (In) (%) °F °F
48 4 382134 12:40 1:33 10 5 4 5.0 77 81
LOCATION:
48 PAVING - TURN LANE AT Mac ARTHUR SOUTH BOUND LANE
REMARKS:
Rone Engineers, Inc.