Loading...
Latter-day-LR 950530Rone Engineers Geotechnical Consultants Materials Testing "' R neEngineers Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Plrchase Order Rl )art Date Number D4251B-070 To JOHN R. HORTON, ARCHITECT Date of Observation APRIL 27, 1995 Location SCREEN WALL - DRILL SHAFTS #47 THRU #53 Contractor W. B. KIBLER CONSTRUCTION TXI 41 N/A I 3~r0471 / Mix Number Mix Description 8273 Weather Conditions PARTLY CLOUDY Ambient Temperature (°F) lC( 69 17 05~30~95 ,ncrete Temperature (°F) Time Sampled Water Added 2:30 PM 0.0 GALS Physical Data ACTUAL SPE( FICATIONS SLUMP (in.) -- 4 1/4 Concrete Cylinder Test(s) ACTUAL SPEC FICATIONS (Days) Test Date Tot Load Compressive (lbs.) Strength (psi) Specimen No. 45A 7 5/04/95 92000 3250 45B 28 5/25/95 113000 4000 45C 28 5/25/95 115000 4070 45D HOLD HOLD 4OOO Stren, Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution Standard 6" x 12" Engineer/Technician Area 28.27 sq. in. Distribution: (1) -- JOHN R. HORTON (1) -- W.B. KIBLER C.QNSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL LIMITATIONS: The te~t results presented herein were prepared based upon tP~e ~pecifi~ samples provided for testing. Wa asau.~e no qulli~y (composition, appearance, performance, etc.) or any ot~r felture of slm~llr subject matter prowded by ~s~ or co.mans , Our letters a~ reports ~e for t~ excl~ive ~e of t~ clients ~o whom t~y are ~dressed. th Required (psi) respo~.."Jibility for variation in May 30, 1995 c:\wpwin\forms\cylinder.rpt-95/kjh PAUL 3TOWELL