Latter-day-LR 950530 (2)Rone Engineers
Geotechnical Consultants
Materials Testing
RO -
'"' neEngineers
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number I Date of Observation
D4251B-078 I MAY 18, 1995
To
JOHN R. HORTON, ARCHITECT
IPlrchase Order
Rlport Date
05/30/95
Location
PAVING - TURNLANE AT Mac ARTHUR SOUTH BOUND LANE
Contractor .
W. B. KIBLER CONSTRUCTION
I' I
Supplier Plant Truck
TXI 31 362
Mix Number
Mix Description
:ket
2134
Weather Conditions
PARTLY SUNNY
Time Sampled I Water Added
1:33 PM I 5.0 GALS
Physical Data
Ambient Temperature (°F) Cc
77
8
ACTUAL
SLUMP (in.) -- 4 '-
ncrete Temperature (°F)
SPEC IFICATIONS
Concrete Cylinder Test(s)
ACTUAL SPEC IFICATIONS
Test Date I Tot Load
I
(lbs.)
Specimen Age
No. (Days)
93000
Compressive
Strength (psi)
329O 400O
Streng
48A 7 5/25/95
48B 28 6/15/95
48C 28 6/15/95
48D HOLD HOLD
Standard 6" x 12" I
Area 28.27 sq. in.
Curing Method I Test Method
ASTM C 31I ASTM C 39
Remarks and/or Distribution
Distribution:
(1)--JOHN R. HORTON
(1) --W.B. KIBLER CONSTRUCTION
(1) --BILL FOWKES
(1) --CITY OF COPPELL
Engineer/Technician KEVIN TUCKER
LIMITATIONS: The test re~JIt~ presented herein were prepared based upon the specific samples provided for testing. We a~ume no
duNity Icompoaition, eppelrence, performance, etc.} or any ot~r feature of timillr s~ject matter provided by ~rso~ o¢ c~ilio~
O~ letters e~ reports ~e for t~ exclusive ~e of t~ clients to wh~ t~y ere Iddf~s~.
£h Required (psi)
c:\wp win\forms\cylinder.rpt-95/kjh
resl~onsibility for variation in
var which we have no control.
May 30, 1995