Loading...
Latter-day-LR 950530 (2)Rone Engineers Geotechnical Consultants Materials Testing RO - '"' neEngineers Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number I Date of Observation D4251B-078 I MAY 18, 1995 To JOHN R. HORTON, ARCHITECT IPlrchase Order Rlport Date 05/30/95 Location PAVING - TURNLANE AT Mac ARTHUR SOUTH BOUND LANE Contractor . W. B. KIBLER CONSTRUCTION I' I Supplier Plant Truck TXI 31 362 Mix Number Mix Description :ket 2134 Weather Conditions PARTLY SUNNY Time Sampled I Water Added 1:33 PM I 5.0 GALS Physical Data Ambient Temperature (°F) Cc 77 8 ACTUAL SLUMP (in.) -- 4 '- ncrete Temperature (°F) SPEC IFICATIONS Concrete Cylinder Test(s) ACTUAL SPEC IFICATIONS Test Date I Tot Load I (lbs.) Specimen Age No. (Days) 93000 Compressive Strength (psi) 329O 400O Streng 48A 7 5/25/95 48B 28 6/15/95 48C 28 6/15/95 48D HOLD HOLD Standard 6" x 12" I Area 28.27 sq. in. Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution Distribution: (1)--JOHN R. HORTON (1) --W.B. KIBLER CONSTRUCTION (1) --BILL FOWKES (1) --CITY OF COPPELL Engineer/Technician KEVIN TUCKER LIMITATIONS: The test re~JIt~ presented herein were prepared based upon the specific samples provided for testing. We a~ume no duNity Icompoaition, eppelrence, performance, etc.} or any ot~r feature of timillr s~ject matter provided by ~rso~ o¢ c~ilio~ O~ letters e~ reports ~e for t~ exclusive ~e of t~ clients to wh~ t~y ere Iddf~s~. £h Required (psi) c:\wp win\forms\cylinder.rpt-95/kjh resl~onsibility for variation in var which we have no control. May 30, 1995