Loading...
WA9302-LR 951212I~'EOTECHNICAL E GEE Consultants, Inc. E iNViRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: December 12, 1995 Date Concrete Phtced: November 3, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 43 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Phtnt: RediMix Concrete - Plant #1 Location of Placement: Piers MATERIALS ~ ......, ~to~ ,v~,. INSPECTION DATA Des cription (Lbs. / Cu. Yd) Mix Number: 686 Time Sample Batched: 10:10 am Cement: Time Sampled: 11:20 am Fly Ash: Sample Location: Pier No. H4 Truck/Ticket No: 170/13998 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: Fine Aggregate: Concrete Range: 46°F Slump Range (inches): 2.5" Admixtures: Weather Conditions: Cloudy 1 Time Started: 7:00 anl 2 Time Completed: 4:45 plll Added Water: Sample Air Content (%): No Test Total Cubic Yards Placed: 7.75 C.Y. Required Strength (Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Load Compressire Strength Remarks Number Slump (hL) (Days) Tested (Lbs.) (Lbs./Sq. In.) CWT 173 2.5" 7 11/13/95 151,780 5,370 CWT 174 2.5" 7 11/13/95 142,520 5,040 CWT 175 2.5" 28 12/04/95 175,560 6,210 CWT 176 2.5" 28 12/04/95 189,160 6,690 Test Methods Utilized Fracture Regular Cylinders Made By: P. Chen ASTM C-31,C-39,C-143 (Unless Noted Otilerwise) Remarks and/or Distribution: co: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea {3RE Consultants, Inc. .Reviewed by: ~~'