REPORT OF CONCRETE MIX INSPECTION
Report Date: December 12, 1995 Date Concrete Phtced: November 3, 1995 Standard 6"x12"
Client: City of Coppell Area 28.27 Square Inches
Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 43
Contractor: Natgun Construction Project No.: 95-0196
Concrete Supplier and Phtnt: RediMix Concrete - Plant #1
Location of Placement: Piers
MATERIALS ~ ......, ~to~ ,v~,. INSPECTION DATA
Des cription (Lbs. / Cu. Yd)
Mix Number: 686 Time Sample Batched: 10:10 am
Cement: Time Sampled: 11:20 am
Fly Ash: Sample Location: Pier No. H4
Truck/Ticket No: 170/13998
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range:
Fine Aggregate: Concrete Range: 46°F
Slump Range (inches): 2.5"
Admixtures: Weather Conditions: Cloudy
1 Time Started: 7:00 anl
2 Time Completed: 4:45 plll
Added Water: Sample Air Content (%): No Test
Total Cubic Yards Placed: 7.75 C.Y.
Required Strength (Lbs./sq.in.): 4,000
Specimen Measured Age Date Total Load Compressire Strength Remarks
Number Slump (hL) (Days) Tested (Lbs.) (Lbs./Sq. In.)
CWT 173 2.5" 7 11/13/95 151,780 5,370
CWT 174 2.5" 7 11/13/95 142,520 5,040
CWT 175 2.5" 28 12/04/95 175,560 6,210
CWT 176 2.5" 28 12/04/95 189,160 6,690
Test Methods Utilized Fracture Regular Cylinders Made By: P. Chen
ASTM C-31,C-39,C-143 (Unless Noted Otilerwise)
Remarks and/or Distribution:
co: Mr. Larry Davis - City of Coppell
Mr. Bob Barbarisi, Jr. - Natgun Corporation
Mr. Gary Hendricks - Shimek, Jacobs and Finklea
{3RE Consultants, Inc. .Reviewed by: ~~'