Loading...
Latter-day-LR 950531Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number I Date of Observation D4251B-073 I MAY 01, 1995 To JOHN R. HORTON, ARCHITECT trchase Order leport Date 05~31/95 Location PIERS #J Contractor ,.. W. B. KIBLER CONSTRUCTION Supplier Plant I Truck T~cket TXI 31 362 3[72107 / Mix Number Mix Description 8273 Weather Conditions CLOUDY Time Sampled I Water Added 9:53 AM ] 0.0 GALS Physical Data Ambient Temperature (°F) C 66 Dncrete Temperature (°F) '6 ACTUAL SPE( IFICATIONS SLUMP (in.) -- 4 1/2 Concrete Cylinder Test(s) ACTUAL SPE(:IFICATIONS Specimen Age I Test DateI Tot Load Compressive No. (Days) (lbs.) Strength (psi) 46A 7 5/08/95 91500 3240 46B 28 5/29/95 120500 4260 46C 28 5/29/95 120000 4240 46D HOLD HOLD 4OOO Stren ~th Required (psi) Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution Standard 6" x 12" Engineer/Technician Area 28.27 sq. in. Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CO~NSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL LIMITATIONS: The test results presented herein were prepared based upon the el~cific samples provide~ for tsstir~h We assume n quality (composition, appears'ice, perform~ce, etc.} or any ot~r feature of limilE subject matter provid~ by perso~ or co~i~iom Our letters ~ reports a¢e for t~ exclusive ~e o~ t~ clients to whom t~y are ~dreesed. c:\wpwin\forms\cylinder.rpt-95/kjh KEVII~ TUCKER responsibility for verietion in over which we have no control. May 31, 1995