Latter-day-LR 950613 (4)Rone Engineers, Inc.
Geotechnical Consultants
Materials Engineering Testing
Project:
Report No.
To:
Report of:
RoneEngineers.
.ll -
GENERAL REPORT
JESUS CHRIST OF LATTER DAY SAINTS CHURCH
D4251B-083 Sample Date: 6/09/95 R
JOHN HORTON, ARCHITECT
ROOF TILES PERMEABILITY TEST
~port Date: 6/13/95
One tile was selected for the permeability test. A 7 sq. in. sectio~
inches of water head above the main water course. No traceable water v
the underneath side after an elapsed time of 24 hours.
was tested with 2
tas detected from