Loading...
WA9302-LR 951212 (2)[~'EOTECHNICAL E GEE Consultants, Inc. E I NVIRONMENTAL 2540 Glenda Lane · Suite 108 ° Dallas, Texas 75229 · (214) 620-9791 ° Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: December 12, 1995 Date Concrete Placed: November 3, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 42 contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant//1 Location of Placement: Piers K-4, L-3, J-4, I-4 MATERIALS ~ou~oe, ~at~ '~. INSPECTION DATA Description (Lbs./C;'u .Yd) Mix Number: 686 Time Sample Batched: 9:05 am Cement: Time Sampled: 10:05 am Sample Location: Pier No. L-3 Fly Ash: TmcldTicket No: 13874 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: Fine Aggregate: Concrete Range: Admixtures: Slump Range (inches): 5.5" Weather Conditions: Overcast/Cloudy 1 Time Started: 7:00 am 2 Time Completed: 4:00 pm Added Water: Sample Air Content (%): No Test Total Cubic Yards Placed: 7.75 C .Y. Required Strength (Lbs./sq.in.): 4,000 Spechnen Measured Age Date Total Lead Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) CWT 169 5.5" 7 11/10/95 131,740 4,660 CWT 170 5.5" 7 11/10/95 148,560 5,250 CWT 171 5.5" 28 12/01/95 169,660 6,000 CWT 172 5.5" 28 12/01/95 164,220 5,810 Test Methods Utilized Fracture Regular Cylinders Made By: T. Grimm ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks and/or Distribution: co: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea ~ L GEM Coneultants, Inc. Reviewed by: