Latter-day-LR 950612Rone Engineers
Geotechnical Consultants
Materials Testing
RoneEn
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number I Date of Observation
I
MAY 11, 1995
D4251B-075
IPlrchase Order
R13ore Date
To
JOHN R. HORTON, ARCHITECT
Location
WEST SCREEN WALL COLUMNS (10TH COLUMN SOUTH OF NORTH END}
Contractor
W. B. KIBLER CONSTRUCTION
Supplier IPlant ITruck
ON-SITE - PORTABLE MIXER
Mix Number
TYPE "S" MORTAR (1800 PSI)
Weather Conditions CLEAR
Mix Description
06/12/95
Time Sampled I Water Added
3:30 PM I .0 GALS
Physical Data
ACTUAL
JTicket
Ambient Temperature (°F)
SLUMP (in.) -- N/A
Concrete
Cylinder Test(s)
lC
ACTUAL
No. (Days) (lbs.) Strength (psi)
SPE(
47A 7 5/18/95 3100 775
47B 28 6/08/95 3350 840*
47C 28 6/08/95 3550 890'
47D HOLD HOLD
Curing Method
ASTM C 31
SPE(
1800
Stren
ITest Method Standard 6" x 12" Engineer/Technician
ASTM C 39 Area 28.27 sq. in.
Remarks and/or Distribution
* DOES NOT MEET PROJECT SPECIFICATIONS
Distribution: (1) --JOHN R. HORTON
{1) --W.B. KIBLER CONSTRUCTION
{1) -- BILL FOWKES
(1) -- CITY OF COPPELL
LIMITATIONS: The test tofutti presented herein were I)repored based Ul:lon the specific aamples provided for te~ting. We Illume
quality {coml~cmition, appearance, performance, etc.) or any other feature of limila~ lubject matter provided by pera~rm or condition~
Ou~ letterl and reporte are for the exclusive use of the clients to whom they are sddreased.
)ncrete Temperature {°F)
:iFICATIONS
:IFICATIONS
c:\wpwin\forms\cylinder.rpt-95/kjh
BOBB RAY
£h Required (psi)
rospor~ibility for varietion in
which we have no control.
June 12, 1995