Loading...
ST0001-CS010905 T H E ¢ I T Y O F September 5, 2001 Mr. Jeremy Lampert Rone Engineers 121 North Rayner Street Fort Worth, Texas 76111 RE: Creekview Drive and Freeport Parkway Project ST 00-01 Construction Materials Testing Dear Mr. Lampert: The City of Coppell intends to construct the Creekview Drive and Freeport Parkway Project. The project consists of approximately 2800 linear feet of four-lane undivided roadway, the reconstruction of approximately 800 linear feet of an existing two-lane road to a four-lane divided roadway, drainage improvements, sidewalks, and 3600 linear feet of 8- to 12-inch water line. It is anticipated that construction will begin in October 2001. We are providing an estimate of the type and number of construction materials tests required for the Project based on the construction plans and the City's standards. Please submit a proposal for the construction materials testing. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please contact me at 972-304-3679. Sincerely, aylor rdinator Attachments 255 PARKWAY ~ PO.BOX 478 ~ COPPELL TX 75019 11{ TEL 972/462 0022 I~ FAX 972/304 3673