WA9302-LR 951212 (3)'EOTECHNICAL
E GEE Consultants, Inc.
E
~ NVIRONMENTAL
2540 Glenda Lane · Suite ]08 · Dallas, Texas 75229 · (214) 620-9791 · Fax (2]4) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: December 12, 1995 Date Concrete Placed: November 8, 1995 Standard 6"x12"
Client: City of Coppell Area 28.27 Square Inches
Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 45
Contractor: Natgun Construction Project No.: 95-0196
Concrete Supplier and Plant: RediMix Concrete - Plant #1
Location of Placement: Piers
MATERIALS s ....., ~,a~ ,~. INSPECTION DATA
Description (Lbs ./CU.Yd)
Mix Number: 686 Time Sample Batched: 10:20 am
Cement: Time Sampled: 11:05 am
Fly Ash: Sample Location: Pier No. N-2
Track/Ticket No: 163/14252
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 65°F
Fine Aggregate: Concrete Range: 65°F
Admixtures: Slump Range (inches): Y'
Weather Conditions: Sunny
1 Time Started:
2 Time Completed:
Added Water: 5 gal. water on site Sample Air Coment (%): No Test
Total Cubic Yards Placed: 7.75 C .Y.
Required Strength (Lbs./sq.in.): 4,000
Speehnen Measured Age Date Total Load Compressire Strength Relmarks
Number Slump (hL) (Days) Tested (Lbs.) (Lbs./Sq.ln.)
CWT 181 3" 7 11/15/95 139,880 4,950
CWT 182 3" 7 11/15/95 136,280 4,820
CWT 183 3" 28 12/06/95 175,420 6,200
CWT 184 3" 28 12/06/95 167,320 5,920
Test Methods Utilized Fracture Regular CylBders Made By: P. Chen
ASTM C-31,C-39,C-143 (Unless Noted Other, vise)
Remarks and/re' Distribution:
cc: Mr. Larry Davis - City of Coppell
Mr. Bob Barbarisi, Jr. - Natgun Corporation
Mr. Gary Hendricks - Shirnek, Jacobs and Finklea ~~
GEE Coneultants, Inc. Reviewed by: