Latter-day-LR 950620Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
REPORT OF FIELD INSPECTION OF CONCRETE
RoneEngineers.
50 RETAINING WALL PIERS AND LIGHT STANDARD BASE
REMARKS:
TECHNICIAN: STEVE JOHNSTON
--7
Rone Engineers, Inc.
TESTED FOR: JOHN HORTON PROJECT: CHURCH OF JESUS CH IST LATTER-DAY SAINTS
REPORT DATE: 06/20/95
SAMPLE DATE: 06/13/95 OUR REPORT NO. D4251 B-086
FIELD DATA:
No of Concrete Water Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump Content Temp Temp
No Made Number Batched Unloaded Concrete (Gal)(I;) (%) °F °F
50 4 397725 11:55 1:10 10 0 N/A 85 90
~ LOCATION: