Loading...
WA9302-LR 951212 (4)U'EOTECH N ICAL E I GEE Consultants, Inc. E [ NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: December 12, 1995 Date Concrete Placed: November 10, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 47 Contractor: Natgun Construction Project No.: 95 -0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Piers H.5-1 and L.5-1 MATERIALS ~ ...., ~at~ ,,,,~. INSPECTION DATA Descriptio~:~ (Lbs .tCu. Yd) Mix Number: 686 Time Sample Batched: 10:33 am Cement: Time Sampled: I 1: 10 am Fly Ash: Sample Location: Pier No. L.5-1 Track/Ticket No: 144'72 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 65°F Fine Aggregate: Concrete Range: 55°F Admixtures: Slump Range (inches): 5.5" Weather Conditions: Overcast 1 Time Started: 7:00 am 2 Time Completed: 1:30 pm Added Water: Sample Air Content (%): No Test Total Cubic Yards Placed: 7.75 C.Y. Required Strength (Lbs./sq.in.): 4,000 specimea~ Measured Age Date Total Load Compressive Strength Remarks Number Slump (W.) (Days) Tested (Lbs.) (Lbs./Sq.hL) CWT 189 5.5" 7 11/11/95 111,000 3,930 CWT 190 5.5" 7 11/11/95 108,400 3,830 CWT 191 5.5" 28 12/07/95 153,160 5,420 CWT 192 5.5" 28 12/07/95 145,500 5,150 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Otherwise) CylWders Made By: P. Chen Remarks and/or Distribution: CC: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea GRE Consultants, Inc. Reviewed by: ~/~