Loading...
Latter-day-LR 950620 (2)Rone Engineers Geotechnical Consultants Materials Testing oneEngineers Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number I Date of Observation D4251B-078 I MAY 18, 1995 To JOHN R. HORTON, ARCHITECT lurchase Order IIeP°rt Date 06/20/95 Location PAVING - TURNLANE AT Mac ARTHUR SOUTH BOUND LANE Contractor W. B. KIBLER CONSTRUCTION Supplier IPlant I Truck 31 362 [icket 82134 TXl Mix Number Weather Conditions PARTLY SUNNY Time Sampled I Water Added 1:33 PM I 5.0 GALS Mix Description Ambient Temperature (°F) 77 ;oncrete Temperature (°F) Physical Data ACTUAL SPE SIFICATIONS SLUMP (in.) -- 4 Concrete Cylinder Test(s) ACTUAL SPE SIFICATIONS Tot Load Compressive No. (Days) Test Date (lbs.) Strength (psi) 48A 7 5~25~95 93000 3290 48B 28 6/15/95 114500 4050 48C 28 6/15/95 118500 4190 48D HOLD HOLD Curing Method Test Method ASTM C 31 ASTM C 39 Remarks and/or Distribution 400O Strer Distribution: (1) -- JOHN R. HORTON IStandard 6" x 12" Engineer/Technician Area 28.27 sq. in. (1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWKES -' (1) -- CITY OF COPPELL KEVII Ith Required (psi) LIMITATIONS: The te~t results presented herein were prepared ba~e~ upon the specific aemple~ provided for testis. We I!1~! quality {compoliti~, Ip~a~l~e, p~form~ce, otc.) or any other fealure of similar subject matter provid~ by ~rso~ or co~itior O~ letters ~ report1 Ire for t~ excl~ive use of t~ clients to wh~ t~y ire ~dr~. c:\wpwin\forms\c¥1inder.rpt-95/kjh TUCKER no responability tot vuietion in over which we have ne control. June 20, 1995