Latter-day-LR 950620 (2)Rone Engineers
Geotechnical Consultants
Materials Testing
oneEngineers
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number I Date of Observation
D4251B-078 I MAY 18, 1995
To
JOHN R. HORTON, ARCHITECT
lurchase Order
IIeP°rt Date
06/20/95
Location
PAVING - TURNLANE AT Mac ARTHUR SOUTH BOUND LANE
Contractor
W. B. KIBLER CONSTRUCTION
Supplier
IPlant I Truck
31 362
[icket
82134
TXl
Mix Number
Weather Conditions PARTLY SUNNY
Time Sampled I Water Added
1:33 PM I 5.0 GALS
Mix Description
Ambient Temperature (°F)
77
;oncrete Temperature (°F)
Physical Data
ACTUAL SPE SIFICATIONS
SLUMP (in.) -- 4
Concrete Cylinder Test(s)
ACTUAL SPE SIFICATIONS
Tot Load Compressive
No. (Days) Test Date (lbs.) Strength (psi)
48A 7 5~25~95 93000 3290
48B 28 6/15/95 114500 4050
48C 28 6/15/95 118500 4190
48D HOLD HOLD
Curing Method Test Method
ASTM C 31 ASTM C 39
Remarks and/or Distribution
400O
Strer
Distribution:
(1) -- JOHN R. HORTON
IStandard 6" x 12" Engineer/Technician
Area 28.27 sq. in.
(1) -- W.B. KIBLER CONSTRUCTION
(1) -- BILL FOWKES -'
(1) -- CITY OF COPPELL
KEVII
Ith Required (psi)
LIMITATIONS: The te~t results presented herein were prepared ba~e~ upon the specific aemple~ provided for testis. We I!1~!
quality {compoliti~, Ip~a~l~e, p~form~ce, otc.) or any other fealure of similar subject matter provid~ by ~rso~ or co~itior
O~ letters ~ report1 Ire for t~ excl~ive use of t~ clients to wh~ t~y ire ~dr~.
c:\wpwin\forms\c¥1inder.rpt-95/kjh
TUCKER
no responability tot vuietion in
over which we have ne control.
June 20, 1995