Loading...
Latter-day-LR 950620 (3)Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number IDate of Observation JUNE 5, 1995 IPIrchase Order R13orr Date D4251B-080 To JOHN R. HORTON, ARCHITECT Location PAVING - PARKING AREA DIRECTLY BEHIND BLDG. 5' FROM WEST END OF SLAB Contractor W. B. KIBLER CONSTRUCTION Supplier IPlant ITruck Ticket REDI-MIX 1 172 1 ~012 / Mix Description Mix Number Weather Conditions CLEAR Ambient Temperature (°F) J8C: 80 Time Sampled Water Added 1:30 PM 9.0 GALS 06/20/95 )ncrete Temperature (°F) Physical Data ACTUAL SPE(;IFICATIONS SLUMP (in.) -- 4 Concrete Cylinder Test(s) ACTUAL SPE(;IFICATIONS No. (Days) (lbs.) Strength (psi) 49A 7 6/12/95 99500 49B 28 7/03/95 49C 28 7/03/95 49D HOLD HOLD Curing Method Test Method ASTM C 31 ASTM C 39 Remarks and/or Distribution 352O 4000 Stren JStandard 6" x 12" J Engineer/Technician Area 28.27 sq. in. th Required (psi) Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CO_NSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL LIMITATIONS: The lest results presented herein were prepared based upon the specific samples provided for testing. We assume n, quality {compoaition0 Ippearence, performance, etc. J ~ ~y other feature of eimilar subject maft~ provid~ by perso~ or co~itiom O~ lettem I~ reports are for t~ excl~ive ~e of t~ client~ to whom t~y are ~dras~. c:\wpwin\forms\cylinder.rpt-95/kjh JORY GOLDRING ~ responsibility for vlristion in over which we hive no control. June 20, 1995