Latter-day-LR 950620 (3)Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
IDate of Observation
JUNE 5, 1995
IPIrchase Order
R13orr Date
D4251B-080
To
JOHN R. HORTON, ARCHITECT
Location
PAVING - PARKING AREA DIRECTLY BEHIND BLDG. 5' FROM WEST END OF SLAB
Contractor
W. B. KIBLER CONSTRUCTION
Supplier IPlant ITruck Ticket
REDI-MIX 1 172 1 ~012
/
Mix Description
Mix Number
Weather Conditions CLEAR
Ambient Temperature (°F) J8C:
80
Time Sampled Water Added
1:30 PM 9.0 GALS
06/20/95
)ncrete Temperature (°F)
Physical Data
ACTUAL SPE(;IFICATIONS
SLUMP (in.) -- 4
Concrete Cylinder Test(s)
ACTUAL SPE(;IFICATIONS
No. (Days) (lbs.) Strength (psi)
49A 7 6/12/95 99500
49B 28 7/03/95
49C 28 7/03/95
49D HOLD HOLD
Curing Method Test Method
ASTM C 31 ASTM C 39
Remarks and/or Distribution
352O
4000
Stren
JStandard 6" x 12" J Engineer/Technician
Area 28.27 sq. in.
th Required (psi)
Distribution:
(1) --JOHN R. HORTON
(1) -- W.B. KIBLER CO_NSTRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
LIMITATIONS: The lest results presented herein were prepared based upon the specific samples provided for testing. We assume n,
quality {compoaition0 Ippearence, performance, etc. J ~ ~y other feature of eimilar subject maft~ provid~ by perso~ or co~itiom
O~ lettem I~ reports are for t~ excl~ive ~e of t~ client~ to whom t~y are ~dras~.
c:\wpwin\forms\cylinder.rpt-95/kjh
JORY GOLDRING
~ responsibility for vlristion in
over which we hive no control.
June 20, 1995