Loading...
Latter-day-LR 950623 (2)Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number D4251B-087 IDate of Observation JUNE 13, 1995 Itrchase Order leport Date To JOHN R. HORTON, ARCHITECT Location 3 RETAINING WALL PIERS ON N.E. CORNER OF BUILDING AND LIGHT STANDARD POLE-c Contractor W. B. KIBLER CONSTRUCTION 06/23/95 Supplier I Plant I Truck TXI I 41 I 461 Mix Number 8273 Mix Description Weather Conditions CLEAR Time Sampled I Water Added 12:40 PM I 0.0 GALS physical Data ACTUAL SLUMP (in.) -- 5 Concrete Cylinder Test(s) SPE ACTUAL No. (Days) (lbs.) Strength (psi) 50A 7 6/20/95 112000 3960 50B 28 7/11/95 50C 28 7/11/95 50D HOLD HOLD oncrete Temperature (°F) 0 ;IFICATIONS Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution 40O0 IStandard 6" x 12" I Engineer/Technician Area 28.27 sq. in. Distribution: {1) -- JOHN R.'HORTON (1) --W.B. KIBLER CO.~NSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL SPE ~,IFICATIONS Strer gth Required (psi) c:\wpwin\forms\cyiinder.rpt-95/kjh STEVE JOHNSTON ne r~l~er~ibility fo~ v~iafion in over wJ"lic~ we hive rio corttre~. June 23, 1995