Latter-day-LR 950704Rone Engineers, Inc.
Geotechnical Consultants
Materials Testing
REPORT OF FIELD INSPECTION OF CONCRETE
En
ineers ..
TESTED FOR: JOHN HORTON PROJECT: CHURCH OF JESUS CHRI=~T LA]-rER-DAY SAINTS
REPORT DATE: 07/04/95
SAMPLE DATE: 06130195 OUR REPORT NO. D4251B-089
FIELD DATA:.
No of Concrete Water Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump Content Temp Temp
No Made Number Batched Unloaded Concrete (Gal) (In) (%) °F °F
51 4 411577 10:53 11:15 10 0 5 1/4 4.5 90 90
52 4 411643 11:44 12:09 10 0 5 4.4 90 90
LOCATION:
51 WEST SIDE SIDEWALK - 10' SOUTH OF SIDE ENTRANCE
52 SOUTH SIDEWALK OF MAIN ENTRANCE RAMP
REMARKS:
TECHNICIAN: WAYNE SMITH
Rone Engineers, Inc,