Latter-day-LR 950708Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number I Date of Observation
D4251B-080 I JUNE 5, 1995
To
JOHN R~ HORTON, ARCHITECT
Location
PAVING - PARKING AREA DIRECTLY BEHIND BLDG. 5' FROM WEST END OF SLAB
Contractor
W. B. KIBLER CONSTRUCTION
Supplier Plant I Truck
REDI-MIX 1 I 172
Mix Number
Weather Conditions CLEAR
Mix Description
Time Sampled I Water Added
1:30 PM I 9.0 GALS
Physical Data
RoneEngineerS ..
49A 7 6/12/95 99500 3520
49B 28 7/03/95 121000 4280
49C 28 7/03/95 120000 4240
49D HOLD HOLD
Specimen Age I Test Date I Tot Load Compressive
No. (Days)I I (lbs.) Strength (psi)
4OOO
Curing Method I Test Method
ASTM C 31I ASTM C 39
Remarks and/or Distribution
IStandard 6" x 12" I Engineer/Technician
Area 28.27 sq. in.
Distribution: (1! -- JOHN R. HORTON
(1) -- W.B. KIBLER CO_N. STRUCTION
(1) -- BILL FOWKES
{1) -- CITY OF COPPELL
LIMITATIONS: The te~t re~ltl preeented herein were ixepared beeed u~on.~e. ~ e~ ~ov~ [~[~?~
quMiW (comp~ifi~. Ip~ce. ~orm~. ~c.} or any ot~ feaze or mm,m ~ me,er movm~ oy ~m~ m ~ v
Om ~tt~ ~ repo~ are f~ t~ excl~ve ~e of t~ ~i~ to w~ ~y ~l ~r~.
c:\wp win\forms\cylinder.rpt-95/kjh
Concrete Cylinder Test(s)
ACTUAL SPECIFICATIONS
07/08/95
Ambient Temperature (°F)
80
SPE
Strer
JOR'~
:oncrete Temperature (°F)
;7
OlFICATIONS
~gth Required (psi)
GOLDRING
no r#por~ibility fo~ variation In
over which we hive no
July 8, 1995
SLUMP (in.) -- 4
ACTUAL
Ilurchase Order
leport Date