Loading...
Latter-day-LR 950708Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number I Date of Observation D4251B-080 I JUNE 5, 1995 To JOHN R~ HORTON, ARCHITECT Location PAVING - PARKING AREA DIRECTLY BEHIND BLDG. 5' FROM WEST END OF SLAB Contractor W. B. KIBLER CONSTRUCTION Supplier Plant I Truck REDI-MIX 1 I 172 Mix Number Weather Conditions CLEAR Mix Description Time Sampled I Water Added 1:30 PM I 9.0 GALS Physical Data RoneEngineerS .. 49A 7 6/12/95 99500 3520 49B 28 7/03/95 121000 4280 49C 28 7/03/95 120000 4240 49D HOLD HOLD Specimen Age I Test Date I Tot Load Compressive No. (Days)I I (lbs.) Strength (psi) 4OOO Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution IStandard 6" x 12" I Engineer/Technician Area 28.27 sq. in. Distribution: (1! -- JOHN R. HORTON (1) -- W.B. KIBLER CO_N. STRUCTION (1) -- BILL FOWKES {1) -- CITY OF COPPELL LIMITATIONS: The te~t re~ltl preeented herein were ixepared beeed u~on.~e. ~ e~ ~ov~ [~[~?~ quMiW (comp~ifi~. Ip~ce. ~orm~. ~c.} or any ot~ feaze or mm,m ~ me,er movm~ oy ~m~ m ~ v Om ~tt~ ~ repo~ are f~ t~ excl~ve ~e of t~ ~i~ to w~ ~y ~l ~r~. c:\wp win\forms\cylinder.rpt-95/kjh Concrete Cylinder Test(s) ACTUAL SPECIFICATIONS 07/08/95 Ambient Temperature (°F) 80 SPE Strer JOR'~ :oncrete Temperature (°F) ;7 OlFICATIONS ~gth Required (psi) GOLDRING no r#por~ibility fo~ variation In over which we hive no July 8, 1995 SLUMP (in.) -- 4 ACTUAL Ilurchase Order leport Date