Loading...
WA9302-LR 951212 (6)'EOTECH N ICAL E GEE Consultants, Inc. E [NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 PIER INSPECTION REPORT Report Date: December 12, 1995 Inspection Date: November 9, 1995 Client: City of Coppell Pier Inspection Report No.: 48 Project: Coppell Water Storage Tank Page Number: Page 1 of 1 Identification: Straight Shaft Piers Project Number: 95-0196 Method of Test: Visual Inspection Depth to Pier Shaft Bearing Req'd Actual Total Bearing Casing # Size Strata Pent. Pent. Depth Material Depth Remarks 1-2 24" 24' 1" 11' 6" 11' 8" 35' 9" Gray shale 25' 3" Dry, clean, plumb H-2 24" 23' 10" 11' 6" 11' 7" 35' 5" Gray shale 26' 1" Dry, clean, plumb G-2 24" 23' 11" 11' 6" 11' 8" 35' 7" Gray shale 25' 1" Dry, clean, plumb F.7~1.5 24" 23' 5" 11' 6" 12' 3" 35' 8" Gray shale 24' 7" Dry, clean, plumb J.5-1.5 24" 24' 1" 11' 6" 11' 9" 35' 10" Gray shale 24' 8' Dry, clean, plumb cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of the quantities of apparently identical or similar products.