Latter-day-LR 950708 (2)Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
IDate of Observation
JUNE 30, 1995
Number
D4251B-090
RoneEngineers...
07/08195
Supplier Plant I Truck
TXI 41 ] 467
Mix Number Mix Description
8273
OVERCAST Ambient Temperature (°F)
Weather Conditions
90
Time Sampled I Water Added
11:15 AM I 0.0 GALS
Physical Data
ACTUAL SPE(;IFICATIONS
SLUMP (in.) -- 5 1/4
ENTRAINED AIR (%) -- 4.5
Concrete Cylinder Test(s)
SpecimenNo. (Days)Age I Test Date
51A 7 7/07/95
51B 28 7/28/95
51C 28 7/28/95
51D HOLD HOLD
ACTUAL
Tot Load Compressive
(lbs.) Strength {psi)
1O20OO 3610
SPE( :IFICATIONS
Stren ith Required (psi)
4000
Curing Method I Test Method Standard 6" x 12" Engineer/Technician
ASTM C 31I ASTM C 39 Area 28.27 sq. in.
WAYN I
Remarks and/or Distribution
Distribution: (1) --JOHN R. HORTON
(1) -- W.B. KIBLER CQ_N. STRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
LIMITATIONS: The te~t requite preaented herein wer*
quality [cempeeitien, appearance, perf~mance, etc.) ~' eny other fea~a'e of ~m.m' ~u~lect matter prev~ee~ g¥ pereorm ~- ,~,~,u~.
Our le~e~ ~ re~ ~e f~ ~ excl~ive ~ of ~ clan. to w~ t~Y ~e ~dr~.
c :\wp win\forms\cylinder.rpt-95/kjh
SMITH
)ncrete Temperature (°F)
~ re~ooneibiliW fro' verl~ion in .
over which we h~ve ne
July 8, 1995
To
JOHN R; HORTON, ARCHITECT
Location
WEST SIDE SIDEWALK - 10' SOUTH OF SIDE ENTRANCE
Contractor
W, B. KIBLER CONSTRUCTION
IPlrchase Order
Rlport Date _