Loading...
Latter-day-LR 950708 (2)Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS IDate of Observation JUNE 30, 1995 Number D4251B-090 RoneEngineers... 07/08195 Supplier Plant I Truck TXI 41 ] 467 Mix Number Mix Description 8273 OVERCAST Ambient Temperature (°F) Weather Conditions 90 Time Sampled I Water Added 11:15 AM I 0.0 GALS Physical Data ACTUAL SPE(;IFICATIONS SLUMP (in.) -- 5 1/4 ENTRAINED AIR (%) -- 4.5 Concrete Cylinder Test(s) SpecimenNo. (Days)Age I Test Date 51A 7 7/07/95 51B 28 7/28/95 51C 28 7/28/95 51D HOLD HOLD ACTUAL Tot Load Compressive (lbs.) Strength {psi) 1O20OO 3610 SPE( :IFICATIONS Stren ith Required (psi) 4000 Curing Method I Test Method Standard 6" x 12" Engineer/Technician ASTM C 31I ASTM C 39 Area 28.27 sq. in. WAYN I Remarks and/or Distribution Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CQ_N. STRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL LIMITATIONS: The te~t requite preaented herein wer* quality [cempeeitien, appearance, perf~mance, etc.) ~' eny other fea~a'e of ~m.m' ~u~lect matter prev~ee~ g¥ pereorm ~- ,~,~,u~. Our le~e~ ~ re~ ~e f~ ~ excl~ive ~ of ~ clan. to w~ t~Y ~e ~dr~. c :\wp win\forms\cylinder.rpt-95/kjh SMITH )ncrete Temperature (°F) ~ re~ooneibiliW fro' verl~ion in . over which we h~ve ne July 8, 1995 To JOHN R; HORTON, ARCHITECT Location WEST SIDE SIDEWALK - 10' SOUTH OF SIDE ENTRANCE Contractor W, B. KIBLER CONSTRUCTION IPlrchase Order Rlport Date _