Loading...
Latter-day-LR 950708 (3)Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number D4251 B-091 Date of Observation JUNE 30, 1995 To JOHN R. HORTON, ARCHITECT Location SOUTH SIDWALK AT MAIN ENTRANCE RAMP Contractor W. B. KIBLER CONSTRUCTION RoneEngineers... Ilurchase Order leport Date 07/08/95 Supplier TXI Mix Number 8273 Weather Conditions OVERCAST Time Sampled 12:09 PM IWater Added 0.0 GALS I Plant I Truck 41 531 IMix Description Ambient Temperature (°F) 90 Physical Data ACTUAL SPE SLUMP (in.) --5 ENTRAINED AIR (%) -- 4.4 :oncrete Temperature {°F) 0 ;IFICATIONS Concrete Cylinder Test(s) ACTUAL S PE 31 FI CATION S No. (Days) (lbs.) Strength (psi) 52A 7 7/07/95 99000 3500 52B 28 7/28/95 52C 28 7/28/95 52D HOLD HOLD Standard 6" x 12" Area 28.27 sq. in. 4000 Strer Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWl(ES (1) -- CITY OF COPPELL Engineer/Technician LIMITATIONS: The te~t re~ult~ pre~ented herein were prepered bmmd up~ ~ ~cifi~ .ampi. ~ov~ ~ t.ti~. ~ qu~iW (cemp~iti~, ~M~, ~M ~, -) ~Y O~ la.era ~ rep~ ere f¢ t~ ex~ive m of ~ clien~ to wh~ ~y Ire ~. C :\wpwin\forms\cylinder.rpt-95/kjh WAYNE SMITH gth Required {psi) no ree~e~eibility for veriltion in ever which we have no cent~M. July 8, 1995