Latter-day-LR 950708 (3)Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
D4251 B-091
Date of Observation
JUNE 30, 1995
To
JOHN R. HORTON, ARCHITECT
Location
SOUTH SIDWALK AT MAIN ENTRANCE RAMP
Contractor
W. B. KIBLER CONSTRUCTION
RoneEngineers...
Ilurchase Order
leport Date
07/08/95
Supplier TXI
Mix Number
8273
Weather Conditions OVERCAST
Time Sampled
12:09 PM
IWater Added
0.0 GALS
I Plant I Truck
41 531
IMix Description
Ambient Temperature (°F)
90
Physical Data
ACTUAL SPE
SLUMP (in.)
--5
ENTRAINED AIR (%) -- 4.4
:oncrete Temperature {°F)
0
;IFICATIONS
Concrete Cylinder Test(s)
ACTUAL S PE 31 FI CATION S
No. (Days) (lbs.) Strength (psi)
52A 7 7/07/95 99000 3500
52B 28 7/28/95
52C 28 7/28/95
52D HOLD HOLD
Standard 6" x 12"
Area 28.27 sq. in.
4000
Strer
Curing Method I Test Method
ASTM C 31I ASTM C 39
Remarks and/or Distribution
Distribution: (1) --JOHN R. HORTON
(1) -- W.B. KIBLER CONSTRUCTION
(1) -- BILL FOWl(ES
(1) -- CITY OF COPPELL
Engineer/Technician
LIMITATIONS: The te~t re~ult~ pre~ented herein were prepered bmmd up~ ~ ~cifi~ .ampi. ~ov~ ~ t.ti~. ~
qu~iW (cemp~iti~, ~M~, ~M ~, -) ~Y
O~ la.era ~ rep~ ere f¢ t~ ex~ive m of ~ clien~ to wh~ ~y Ire ~.
C :\wpwin\forms\cylinder.rpt-95/kjh
WAYNE SMITH
gth Required {psi)
no ree~e~eibility for veriltion in
ever which we have no cent~M.
July 8, 1995