Loading...
Latter-day-LR 950714Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number D4251 B-087 IDate of Observation JUNE 13, 1995 RoneEngineers ... Ilurchase Order leport Date To JOHN R. HORTON, ARCHITECT Location 3 RETAINING WALL PIERS ON N.E. CORNER OF BUILDING AND LIGHT STANDARD POLE5 07/14/95 Contractor W. B. KIBLER CONSTRUCTION TXI 41 461 I ~97725 Mix Description / Mix Number 8273 Weather Conditions CLEAR Ambient Temperature (°F) 85 I IWater Added 0.0 GALS oncrete Temperature (°F) 0 Tim. e Sampled 12:40 PM Ph~tsical Data ACTUAL SPEI;IFICATIONS SLUMP (in.) -- 5 Concrete Cylinder Test(s) Specimen No. ACTUAL Tot Load (lbs.) Age I Test Date (Days) I Compressive Strength (psi) SPD Stren 50A 7 6/20/95 112000 50B 28 7/11/95 121000 50C 28 7/11/95 120000 50D HOLD HOLD .'IFICATIONS Ith Required (psi) 396O 4OOO 4280 4240 Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution Distribution: IStandard 6" x 12" I Engineer/Technician Area 28.27 sq. in. STEVE JOHNSTON (1) -- JOHN R. HORTON (1) -- W.B. KIBLER CO__N, STRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL LIMITATIONS: The teet re~ult~ ~'e~ent~cl herein were prepared ~ ~ ~ ~ifi~ a~ pr~ f~ ~. We ~; q~iW (comp~ti~, ~e, ~d~, ~c.) or any o~r fe~e ~ ~d~ ~ maUer prov~ by ~m~ ~ c~mm O~ ~e~ ~ rep~ ~e for t~ ex~ive ~ of ~ cli~t, to w~ ~y ~e ~r~. C:\wp win\forms\cylinder.rpt-95/kjh rmpomil~lity for v~ri~tio~ in which w~ h~ve r~ Cm'grol. July 14, 1995