Latter-day-LR 950714Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
D4251 B-087
IDate of Observation
JUNE 13, 1995
RoneEngineers ...
Ilurchase Order
leport Date
To
JOHN R. HORTON, ARCHITECT
Location
3 RETAINING WALL PIERS ON N.E. CORNER OF BUILDING AND LIGHT STANDARD POLE5
07/14/95
Contractor
W. B. KIBLER CONSTRUCTION
TXI 41 461 I ~97725
Mix Description
/
Mix Number
8273
Weather Conditions CLEAR
Ambient Temperature (°F)
85
I
IWater Added
0.0 GALS
oncrete Temperature (°F)
0
Tim. e Sampled
12:40 PM
Ph~tsical Data
ACTUAL SPEI;IFICATIONS
SLUMP (in.) -- 5
Concrete Cylinder Test(s)
Specimen
No.
ACTUAL
Tot Load
(lbs.)
Age I Test Date
(Days)
I
Compressive
Strength (psi)
SPD
Stren
50A 7 6/20/95 112000
50B 28 7/11/95 121000
50C 28 7/11/95 120000
50D HOLD HOLD
.'IFICATIONS
Ith Required (psi)
396O 4OOO
4280
4240
Curing Method I Test Method
ASTM C 31I ASTM C 39
Remarks and/or Distribution
Distribution:
IStandard 6" x 12" I Engineer/Technician
Area 28.27 sq. in.
STEVE JOHNSTON
(1) -- JOHN R. HORTON
(1) -- W.B. KIBLER CO__N, STRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
LIMITATIONS: The teet re~ult~ ~'e~ent~cl herein were prepared ~ ~ ~ ~ifi~ a~ pr~ f~ ~. We ~;
q~iW (comp~ti~, ~e, ~d~, ~c.) or any o~r fe~e ~ ~d~ ~ maUer prov~ by ~m~ ~ c~mm
O~ ~e~ ~ rep~ ~e for t~ ex~ive ~ of ~ cli~t, to w~ ~y ~e ~r~.
C:\wp win\forms\cylinder.rpt-95/kjh
rmpomil~lity for v~ri~tio~ in
which w~ h~ve r~ Cm'grol.
July 14, 1995