Lakeside V2-LR 960304 Maxim Tach. · Southwestern Labs
2575 Lone Star Dr. · P.O. Box 224227
Dallas, Texas 75222
Telephone: (214) 631-2700
T E C H N O L O G I E S I N C FAX: (214} 920-1891
REPORT OF
IN-PLACE DENSITY
CLIENT: TH~. KRO~ER CO
Attn: Jeff Kruegar
100 Kroger Drive
Keller, TX 76248 PROJ£CTNO.: 0903506037
REPORT NO.: 37957
PROJECT: Kroger ~448 DATE OF SERVICE: 2/22/96
AUTHORIZATION: John
Coppell Tx. REPORT DATE: 3/04/96
SERVICES: Perform in-place density and moisture content tests to determine the degree
of field compaction.
PROJECT DATA MOISTURE/DENSITY RELATIONS
CONTRACTOR: David Christopher, :[nc. OPTIMUM MAXIMUM
MATERIALS MOISTURE % DENSITY I~cf
TESTOF: Utility Backfill & 36653 Red clay sand 13.0 117.5
paving subgrade.
METHOD OF TEST:
DENSITY: ASTM D2922 SPECIFICATION
MOISTURE: ASTM D3017 DENSITY: 95% Dry Density MOISTURE: -+ 2%
REPORT OF TESTS
FIELD OPTIMUM FIELD MAXIMUM
TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY
NO LOCATION (%) (%) (Pcf) (Pcf) (% max)
1. 4" Plumbing line at H.5/6.0
line, final grade. 11.2 13.0 112.6 117.5 96
2. 4" plumbing line at H.5/5.0
line, final grade. 11.0 13.0 112.0 117.5 95
3. Paving subgrade 75' E., 10' $.
of N.E. corner building. 12.0 13.0 113.4 117.5 97
4. Paving subgrade, 75' E. 20' N.
of S.E. corner building. 11.7 13.0 113.1 117.5 96
Report Of Tests Continued On Page 2
1007 JS
Ou~ letter~ end report~ ara fo~ the excl,,~ve u~ ol t~ cli~ to wh~ t~y ~e ~r~ ~ ~1 ~t ~ re~ ex~ in
f~l w,tho~
apply ~y to t~ a~ple
TH1; ~ROG~..R CO REPORT NO. 37957
PROJECT NO. 0903506037 PAGE 2
DATE OF SERVICE: 2/22/96
REPORT OF TESTS ¢Continued)
FIELD OPTIMUM FIELD MAXIMUM
TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY
NO LOCATION (%) (%) (Peri (Pcf) (% max)
5. Paving subgrade 30' N. & 100'
E. of N.W. corner building. 11.3 13.0 113.2 117.5 96
6. Paving subgrade 30' N. & 20'E.
of N.W. corner building. 11.4 13.0 113.0 117.5 96
7. Paving subgrade 20' W. & 10'S.
of N.W. corner building. 11.6 13.0 113.1 117.5 96
8. Paving subgrade 50' W. & 50' S
of N.W. corner building. 11.8 13.0 113.0 117.5 96
Test results on this report meet project
specifications as noted on page 1.
Techoi¢ian: Paul D. Butler Started: 11:30AM Stopped: 01:30PM
C.E.T.
Report(1)(1) DavidTHEDiStribution:KROGERchristopher,CO Inc. M~H . e~O~rTHWESTERN LABS
E , CET
1007 JS
O~ I~em ~ rep~ ~e for ~ eFcl~ve ~ of t~ ~t to w~ t~y ~e ~r~ ~ ~1 ~t ~ re~ ~pt in
f~l w~t~ ~ ~ovM of ~ t~tl~ ~ltory. T~ ~ of.~ ~ r~:v~ ~ wr~en ~ovd. O~ I~e~ ~ re~
~ply o~y tO t~ s~ple t~ ~/~ :~, ~ ~e ~t ~iCltlVe of t~ qu~tz~ of ip~ently ~cd ~ ~mil~ pr~u~.